Home · Maps · About

Home > SubChat
 

[ Read Responses | Post a New Response | Return to the Index ]
[ First in Thread | Next in Thread ]

 

view flat

Re: Lower Montauk Branch Passenger Rail Study (Final Report 2018) could cost over $2 Billion

Posted by GP38/R42 Chris on Mon Feb 12 10:10:35 2018, in response to Re: Lower Montauk Branch Passenger Rail Study (Final Report 2018) could cost over $2 Billion, posted by Joe V on Sat Feb 10 13:53:24 2018.

Because the service was absurd. That's why. There was only ONE local train in the morning (in thee 8:15 leaving Jamaica, and arriving at LIC around 8:45). And in the evening there was one local train the other way around 5:15-5:45) stopping at all the "stations", and a "semi Local" train just about 10 minutes before that stopping only at Penny Bridge, Haberman, and Fresh Pond).

If you couldn't arrange your travel in those short time periods for those three trains, you were shit out of luck. So obviously "no one" rode.

Responses

Post a New Response

Your Handle:

Your Password:

E-Mail Address:

Subject:

Message:



Before posting.. think twice!


[ Return to the Message Index ]