Re: Lower Montauk Branch Passenger Rail Study (Final Report 2018) could cost over $2 Billion |
|
Posted by gp38/r42 chris on Mon Feb 12 15:59:59 2018, in response to Re: Lower Montauk Branch Passenger Rail Study (Final Report 2018) could cost over $2 Billion, posted by AlM on Mon Feb 12 15:52:56 2018. Well it was 4 trains, two full local, one Express and one semi local. Both westbound in the morning, and both eastbound in the evening. Oddly, the two in the morning back to back, and also in the evening back to back. If they were more spread out at least LIC would have been semi usable. |