Re: Lower Montauk Branch Passenger Rail Study (Final Report 2018) could cost over $2 Billion (1465431) | |||
![]() |
|||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
![]() |
Re: Lower Montauk Branch Passenger Rail Study (Final Report 2018) could cost over $2 Billion |
|
Posted by Joe V on Mon Feb 12 19:37:22 2018, in response to Re: Lower Montauk Branch Passenger Rail Study (Final Report 2018) could cost over $2 Billion, posted by gp38/r42 chris on Mon Feb 12 19:17:53 2018. You still have to go through a formal closure procedure with hearings. There are political risks, as they found the hard way with St Albans with its 1 train at the time, with a van size load of people headed to the VA Hospital.So basically, let sleeping dogs lie when there is nothing to gain. They didn't give a shit if it would have saved Oyster Bay commuters 5 minutes. |
![]() |
![]() |
![]() |