Re: Lower Montauk Branch Passenger Rail Study (Final Report 2018) could cost over $2 Billion (1465828) | |||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: Lower Montauk Branch Passenger Rail Study (Final Report 2018) could cost over $2 Billion |
|
Posted by Andrew Saucci on Thu Feb 15 19:44:48 2018, in response to Re: Lower Montauk Branch Passenger Rail Study (Final Report 2018) could cost over $2 Billion, posted by gp38/r42 chris on Mon Feb 12 14:35:48 2018. That's right. When I was at our client in Long Island City, I had to work pretty hard to make sure I got everything done by 4:35 or so if I wanted to walk back to the station and use the evening train. It was usually worth it, especially in the late spring and summer when one could actually enjoy the ride, but not everyone could do that sort of thing. Working for a contractor, I have the luxury of leaving whenever the work is done. Others have to remain at their posts until at least 5. I don't recall the morning train having any useful connections for me, so I'm not sure I ever actually used it. |
(There are no responses to this message.)