RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system

Posted by GojiMet86 on Fri Dec 1 10:23:22 2017

Gateway: http://fourthplan.org/action/gateway


Gateway

Build new rail tunnels under the Hudson and East Rivers

The region is in dire need of a new train tunnel under the Hudson River. Planning and engineering for Amtrak’s Gateway project are underway, but must be accelerated. It must also be modified to include an extension to Queens. As currently planned, Gateway service dead-ends at Penn Station. Extending the tracks to Sunnyside Yards in Queens would provide tremendous benefit to the region by providing travelers with direct crosstown service between New Jersey and Long Island, and greatly increase the efficiency of train movements—increasing capacity across the Hudson River by 38 percent and across the East River by 68 percent. Getting shovels in the ground is of critical urgency to the region’s economic vitality and quality of life.



The design and approvals process for Gateway is both moving too slowly and failing to promote a much more efficient project for New Jersey commuters and the region
Despite existing train tunnels being at capacity for a long time, and flooding from Superstorm Sandy accelerating the need to conduct extensive repairs to them, the Gateway project continues to move forward at a snail’s pace, with its earliest projected completion date being 2026. Considering the daily delays NJ Transit commuters and Amtrak travelers suffer every day, this is simply unacceptable.

What’s more, the Gateway project as planned—with service terminating at Penn Station—is short-sighted in its ability to create a true regional rail system for the tri-state area. A far more efficient scheme would give trains the ability to run straight through Penn, instead of dead-ending there and turning back. Trains traveling through Penn Station could run much closer together, increasing the capacity of the station by 30 percent or more.



Instead of terminating at Penn Station, Gateway should be extended to Sunnyside Yards in western Queens to provide Crosstown Service

As critical as it is to get the Gateway tunnels under construction as soon as possible, the project should be modified to extend through Manhattan and into Sunnyside Yards in Queens.

By providing crosstown service, passengers could travel directly between New Jersey and Long Island, thus increasing regional connectivity while also drastically increasing the capacity of the investment. A through-running configuration, with fewer and wider platforms at Penn Station, would allow for an additional six to nine trains per hour under the Hudson River on top of the additional 24 trains the new Gateway tunnels would allow. These 30-33 trains represent up to a 68 percent increase of what can run under the East River today.

This additional capacity could be used to provide new rail service in parts of New Jersey that are currently reliant on commuter buses (Bergen Loop). Old rail lines in Middlesex, Ocean, and Monmouth counties could be reactivated and connected into the NJ Transit system and Manhattan—greatly improving commuting times and reducing vehicular traffic in New Jersey and across the river.

Building crosstown tracks would also provide additional redundancy across the East River in the event service in the existing tunnels were disrupted.



Build a station at Third Avenue

A new rail station should be built at 31st Street and Third Avenue to provide New Jersey commuters better access to the region’s greatest concentration of jobs, in East Midtown. This station could also ultimately serve as a major hub station linking crosstown into the larger regional rail system proposed in this plan.



Use the new through-running tracks for freight during off-hours

Gateway East could become an important intra-regional freight rail line by connecting New Jersey’s rail freight network and the Ports Newark and Elizabeth with the Lower Montauk freight line in Queens. This would allow goods currently carried by trucks from New Jersey to Queens and Brooklyn to be shipped overnight via rail, thus reducing the number of noisy and polluting trucks crossing the two rivers and traveling through New York City.

At least one tunnel should be constructed to accommodate rail cars with a height clearance of up to 21 feet to enable the operation of freight during off-hours.



Outcomes

By increasing the passenger capacity of the proposed rail tunnels across the Hudson River, Gateway East would support additional employment growth in Manhattan and distribute benefits to New Jersey and other parts of the region. By providing more rail service, it also supports a region with more sustainable land use and energy use, and jobs in locations that can be accessed by a larger number of neighborhoods and residents. Specifically, the project would bring about the following benefits to the region’s residents:

- Direct access to the east side of Manhattan for New Jersey residents
- New direct rail service from Bergen, Passaic, Rockland, and Orange counties
- Expansion of rail service in Middlesex, Monmouth, and Ocean counties
- Substantial reduction in both the number of cars and commuter buses traversing the Hudson River, and congestion and pollution in New Jersey and Manhattan
- Redundancy in the event of a catastrophic event (flooding, terrorism, etc.)
- The opportunity to create an intra-regional freight rail service that would reduce the number of trucks traversing major vehicular water crossings and New York City



Paying for It
The Gateway Project as currently conceived is expected to cost $24-29 billion, including $17 billion for the tunnels alone. Turning it into a real crosstown service by extending tracks to Sunnyside Yards would add $4 billion in construction costs, plus indirect costs that can be as high as the construction costs. Like other major capital investments, a key to financing crosstown is to reduce the cost of building big rail projects.

Some of the revenue needed could come from new real estate development near the new Third Avenue station on the east side of Manhattan or a ticket surcharge, but most would require a new revenue source, such as carbon pricing or new tolling.












Penn Station: http://fourthplan.org/action/penn-station


Penn Station

Expand, overhaul, and unify the Penn Station Complex

New York’s Penn Station, the busiest station in the Americas, is a congested, uninviting, and dangerous underground complex. It needs to be transformed into an expansive and gracious hub for an expanding rail network. Current plans to expand the station complex with a new Moynihan Station across Eighth Avenue and Penn South—a terminus for the proposed Gateway tunnels—should be enlarged to create a unified complex with room for more people and trains, through-running service for both commuter and intercity rail service, and an inspiring design that brings in light and air and pedestrian spaces. Madison Square Garden will need to be relocated to improve security and bring light and air into the terminal.

Penn Station is overcrowded, confusing and substandard

Long reviled for its cramped conditions and uninspiring design, Penn Station has become increasingly dysfunctional, as ridership into the station has nearly tripled in the last 25 years—a level of use never contemplated by the station’s architects. Concourses and platforms are narrow, and vertical circulation to the platforms is inadequate. The station lacks basic amenities like clear signage and comfortable waiting areas. With no natural daylight or other obvious visual markers, it’s easy to get lost. The station also has little to no presence from the street, and pedestrian conditions surrounding Penn are poor.

These problems will be further compounded in the future, as travel across the river increases in the coming decades. Work trips alone are projected to increase by 24 percent or more by 2040, depending on growth in all trans-Hudson travel and the amount of new rail service that connects to the station.



Unify the Penn Station complex into an inspiring gateway to New York

New York’s Penn Station is already a vast complex that extends over two square blocks and three underground levels. In 2020, a new train hall in the Farley Post Office building will be added to this complex, a project known as Moynihan Station. And the Gateway project, currently in the planning stages, will further extend Penn Station southward. These investments will expand the station’s footprint, relieving congestion and finally providing the opportunity to gut-renovate Penn Station.
Create inviting new entrances at Seventh Avenue

Penn Station deserves to have a great presence in Midtown Manhattan. Today’s main entrance at 32nd Street is cramped and unwelcoming; it should be widened and expanded. A new great entrance to the station should also be built on the corner of Seventh Avenue and 33rd Street by turning part of 33rd street into a civic plaza. With new architectural elements running from 31st to 34th Street, Penn Station could also have an improved, uniform presence at the street level along three city blocks.

Underground, there are also great opportunities to improve pedestrian conditions, even without removing Two Penn Plaza and its myriad vertical columns through the station. The Long Island Rail Road concourse, which runs under 33rd Street, should be widened and shifted north. Ceilings should be elevated for better light and air. The Hilton Corridor under 32nd Street should also be widened and extended eastward to connect Penn Station with the subways at Broadway and Sixth Avenue. Finally, the central concourse should also be widened and extended southward to connect to Track One (and later to Penn South), removing the B-level (Amtrak waiting room level) under Two Penn Plaza and lining up the NJT concourse with elevation at the A-level (the same level as the LIRR concourse).



Complete Moynihan Station

A new train hall in the Farley Post Office is under construction and should be completed by 2020. Moynihan Station, as the train hall will be called, will accommodate Amtrak’s main waiting room, its Acela lounge, and many of its back-office functions, freeing up valuable space at the existing Penn Station. The project’s completion should proceed without delay, including a new mid-block passageway to Ninth Avenue.



Move Madison Square Garden

Madison Square Garden’s 10-year special permit is up for renewal in 2023. It should not be renewed. By removing the sports arena and theater, Penn Station’s underground complex will gain much-needed natural light and air, and significantly improve pedestrian circulation and safety.

Previous schemes have suggested replacing Madison Square Garden with a new head house with retail and office space. A recent proposal instead envisioned removing the floors of the arena and its exterior curtain wall, but keeping its structural skeleton and cladding it in glass. Combined with removing one of Penn Station’s underground concourses (on the B-level), this would eliminate over 200 columns from the platforms—freeing up significant space for pedestrian circulation, including stairs and escalators.

Amtrak should move forward with this scheme. The building’s glass curtain wall should be open at street level to provide 360-degree access to the station, and the 33rd Street plaza described above should be extended to Eighth Avenue. Only the station’s three north/south concourses and two or three east/west corridors should remain to better distribute passengers, facilitate orientation, and better integrate the station with the future Penn South.



Build Penn South for running service between New Jersey and Queens

As part of its Gateway proposal to build two new rail tunnels under the Hudson River, Amtrak has been studying extending Penn Station southward, down to 30th Street. The most recent proposal is for a new station, named Penn South, with five platforms and eight tracks, four of which could be extended to Queens in the future.

A far better scheme would be to build the station for through-running trains from the get-go. Because running trains straight through the station is so much more efficient than having trains terminate at Penn and turn around, fewer tracks and wider platforms could be built, while still accommodating up to 33 trains per hour.

In fact, Penn South as is currently proposed—with four stub-end tracks and five platforms of varying widths—would make it much more difficult to retrofit the station into through-running in the future. Instead, the Gateway tunnels to New Jersey should be extended to Sunnyside Yards, with two new tunnels and an intermediary station at Third Avenue.

To facilitate pedestrian circulation in Penn South, a new underground east-west concourse should be built, roughly between 30th and 31st Street, bookending the improved LIRR east-west concourse at the northern edge of the station.



Improve pedestrian conditions at the platform and track level

While a wholesale reconfiguration of platforms and tracks isn’t feasible in such a high-traffic station, some improvements should be made to increase station capacity, reduce congestion on the platforms, and enable through-running regional rail. These include:

Widen select platforms in the center and southern end of Penn Station. This would result in the removal of a number of tracks.
Replace escalators with stairs and elevators on the more narrow platforms to allow for greater vertical capacity.
Simplify the station and improve vertical circulation by removing one of Penn Station’s underground levels and creating a more straightforward circulation scheme for the other level across the entire station complex.
Remove as many old columns (from the original Penn Station) and other non-essential platform elements as possible to increase existing platform capacity.
Install high-density signaling system in East River tunnels to increase their capacity and improve the reliability of the service.



Outcomes
The result of these investments and reconstruction would be a unified Penn Station complex with modern amenities and the capacity to serve a growing region. New York City and the region would finally have a station that reflects its status as a global economic hub and gateway to the metropolitan region. Commuters, intercity passengers, and visitors would enjoy the conveniences of a modern transportation hub, arriving in a station that is no longer a dreary and unpleasant experience but a place to linger and enjoy.



Paying for It
Much, if not all, of the costs for a new Penn Station should be paid for from the value of real estate development that will be created either directly, from air rights that are released, or indirectly, from increases in the value of existing buildings near the site that would benefit from proximity to a redesigned hub that attracts more travelers and becomes a destination itself. For example, moving Madison Square Garden could create more than two million square feet of additional development rights that could be used near the station.












Combined Commuter Network: http://fourthplan.org/action/combined-commuter-network

Combined Commuter Network

Combine three commuter rail systems into one network

The region’s aging commuter rail network leaves many parts of the region poorly served or without rail service at all. It wasn’t designed for today’s travel patterns and has little capacity for future growth. A series of new projects, phased over the next few decades, should combine the three commuter railroads into a unified system that vastly improves mobility throughout the region. The resulting Trans-Regional Express (T-REX) would provide frequent, consistent service, directly connect New Jersey, Long Island, the Mid-Hudson and Connecticut, and allow the region’s economy to continue growing.



The region has outgrown its commuter rail network

The region’s three commuter railroads—Long Island Rail Road, Metro-North Railroad and New Jersey Transit—are an amalgamation of rail lines built largely by private railroads more than 100 years ago. This aging system was designed to get people in and out of Manhattan when the metropolitan area was less than half the size it is today. It poorly serves job centers outside of Manhattan, leaves many places without any rail service at all, isn’t configured to serve today’s 24-hour, multi-directional travel patterns, and is straining to serve the number of riders it has today, much less tomorrow. More specifically:

- Many assets—from stations and signals to tracks and interlockings—are well past their useful life or don’t meet modern standards.
- All service ends in Manhattan, preventing trains from traveling through from one part of the region to the other, and reducing the capacity of the system overall.
- While ridership is growing the fastest outside of morning and afternoon rush hours, service continues to be much worse on most lines at those times than during their peak.
- Reverse service into many job centers with strong growth potential, such as Bridgeport or Hicksville, is poor—and limits the ability of those downtowns to grow into major economic hubs. -
- Some large downtowns such as Paterson have no direct service at all.
- Many residential areas with densities to support commuter rail service don’t have it, including much of Bergen, Passaic, and Monmouth counties.
- Service is too infrequent or too expensive for many residents in the Bronx, Brooklyn, Queens, Hudson, and Essex counties.
- Many parts of the system are already operating well past their capacity, including the rail tunnels under the Hudson River used by all New Jersey Transit trains, Penn Station, and Metro-North’s New Haven line. Over the next 25 years, the number of people commuting from the suburbs into Manhattan could grow by as much as 34 percent, much more than the current system can handle.
- Fragmented control of the system among the different railroads makes it difficult to plan for upgrades and repairs or provide holistic, integrated service.

Many of New York City’s peers, such as Paris and London, have transformed their traditional commuter rail systems to run more like urban metro systems. With more frequent and convenient service to, in, and through the city centers, those systems have increased businesses’ access to a large and varied labor pool. They have also given residents access to more jobs and more housing choices. New York’s disjointed system is holding us back from becoming a truly integrated and economically powerful region.



Convert the region’s three commuter lines into a unified system to increase capacity, expand options, and reduce travel times

The region must modernize, integrate, and expand its commuter rail network to keep up with a growing region, as well as changing technology and service demands. Unifying the network into a Trans-Regional Express service that vastly improves mobility throughout the region will require major infrastructure upgrades to integrate its different components and then expand it. Some actions, like building additional tunnels under the Hudson and creating a more functional Penn Station, address urgent needs and should begin immediately. Others will take a decade or more to be planned and approved. But all improvements should be designed to allow future projects to rationalize and synchronize service as they expand capacity.

Based on an analysis of existing deficiencies, future demand, and project feasibility, a fully integrated regional rail system could be built in three phases.



Phase one: The Crosstown Line creates through-running service from New Jersey to Long Island

The Crosstown line builds on Amtrak’s Gateway plans to build new rail tunnels under the Hudson River and expand Penn Station. The fourth plan proposes those tunnels and tracks be extended to build new tunnels under the East River to provide a new through-running Crosstown service between New Jersey and Long Island. Instead of a terminal, RPA’s proposed Penn South would become a through-running station with two tubes extending east to Queens. A new station on 31st Street and Third Avenue would provide suburban commuters access to southeast Midtown. The Crosstown line will address the immediate crisis of declining service across the Hudson while creating a range of new benefits:

- It would provide capacity for six to nine more trains per hour from New Jersey than the Gateway project as it is currently planned, and result in a total of 30 to 33 more trains from both New Jersey and Long Island into Penn Station.
- NJ Transit riders would have direct service to Manhattan’s East Side, and Long Island Rail Road riders would have a second east side destination, in addition to the Grand Central LIRR station currently under construction.
- The additional capacity would allow old rail lines to be reactivated, and large parts of Monmouth, Ocean, and Middlesex counties could gain direct rail access into Manhattan.
- New Jersey commuters would be able to go directly to Jamaica to board the JFK AirTrain, and LIRR riders could travel directly to the rail stop for Newark Airport.
- The additional East River tunnels would provide greater resiliency in case of flooding, terrorism, or other disruptions.



Phase two: Additional trans-Hudson and east side service, and restored passenger service in northeastern New Jersey

Before 2040, it is expected that the Gateway/Crosstown tunnels will also be at capacity. And even though 2040 sounds like a long way off, planning and building infrastructure of this scale can take decades, so it really shouldn’t be too long before we begin to plan for the next set of trans-Hudson tunnels. Additional rail tunnels from Union City, NJ, to 57th Street in Midtown would provide the next trans-Hudson capacity expansion after Crosstown reaches full capacity. New tunnels at 57th Street would also allow for the restoration of passenger service on the West Shore line, a portion of the Northern Branch line, and the Susquehanna lines in Bergen, Passaic, and Rockland counties. These areas are almost exclusively served by express buses today. The completion of this portion of the system would likely reduce the demand for express buses significantly enough to enable the Port Authority to replace its current bus terminal with either a smaller Manhattan facility or bus intercept facilities in New Jersey.

Beyond providing new rail service to many New Jersey communities, this second phase of the proposed regional rail network would provide a new north-south transit service on the East Side of Manhattan from 57th Street, running south under Third Avenue, and making four to five stops to Lower Manhattan, a corridor that currently is only served by the Lexington Avenue subway. This service could obviate the need to construct the lower portions of the Second Avenue Subway. This “Manhattan Spine” would be connected to the Crosstown line via a new hub station located at 31st St and Third Ave, allowing a seamless transfer between the Crosstown and the new service that would run along 57th Street and down Third Avenue.

The Manhattan Spine would continue to run downtown, stopping at Fulton and Water Street, and then into Downtown Brooklyn, where it would connect with the Long Island Rail Road at Atlantic Terminal. This portion of the line would provide robust and speedy rail transit service to parts of outer Brooklyn and southeastern Queens, which currently have limited transit options. A short extension to JFK Airport would also be made using part of the existing Rockaway Beach Branch line, south of the Atlantic Branch, along with the construction of a short new segment with two new stations at the airport.

These investments would provide the following benefits:

- Transit capacity to support the continued expansion of the region’s economy
- Vastly improved service and much shorter travel times for residents of Bergen, Passaic, and Rockland counties
- Reduced crowding at Penn Station
- Elimination of the need to build a large bus terminal
- Possible elimination of the need for building the lower portions of the Second Avenue Subway
- Direct service connecting New Jersey, Manhattan, Brooklyn, Queens, and JFK Airport



Phase Three: Completing a fully interconnected regional rail network

The final phase of constructing the regional rail system entails completing the uptown portion of the Manhattan Spine to connect to the Bronx, Westchester, the Hudson Valley, and Connecticut, and the lower trans-Hudson tunnels that would complete a “Jersey Loop” that connects to service in the north to Hudson County.

The Uptown portion of the Spine would provide relief for Metro-North’s Park Ave Tunnel, which currently runs at capacity. The completion of Penn Access, a project to add tracks and station on the Hell Gate line so that Metro-North Railroad’s New Haven line trains can directly access Penn Station, should reduce stress on the Park Avenue Tunnel, buying some time for Metro-North. But the project will not ultimately divert any riders bound for the East Side. The Uptown portion of the Manhattan Spine, however, would provide relief, paralleling the Park Ave Tunnel along Third Avenue, providing a new express track through the Bronx from Mott Haven to Woodlawn, and seamlessly connecting the Mid-Hudson and Connecticut into the new regional rail system.

The lower leg of the Jersey Loop will provide a third new set of trans-Hudson tunnels, reducing future congestion, improving access to Hudson County, creating opportunities for more direct travel within the region, and providing additional redundancy. The construction of this new tunnel could also serve as a replacement for the Uptown PATH, which has tunnels over a century old, small stations, an inefficient junction, and a terminal at Hoboken that limits capacity and performance and is costly to maintain. On the New Jersey side of the Hudson River, the tunnels will lead to a station at Hoboken/Newport and a new stations in Jersey City Heights via the Bergen Arches, eventually connecting into the existing NJ Transit system.

This expansion would allow for the complete unification of the regional rail network with the following improvements:

- Less crowding, improved reliability, and more service for Metro-North riders
- Direct access through Manhattan from Westchester, the Mid-Hudson, and Connecticut, to New Jersey and Long Island
- Transit service for Bronx residents in the Third Avenue corridor, which today has very poor transit access
- Direct access to JFK Airport from the Bronx, Westchester, Mid-Hudson, and Connecticut
- Expanded service for residents of Hudson County and reduced crowding for New Jersey Transit riders at Penn Station
- Elimination of the need to replace the PATH Uptown line



Provide frequent service in all directions

The physical connections described above would allow for transformative improvements to rail service. Instead of long wait times, passengers in the Bronx, Queens, Hudson, Westchester, and Nassau counties would have access to more subway-like frequencies—in both directions. Passengers in Bergen, Passaic, Monmouth, Hudson and Essex counties would have access to the rail network with consistent service. Finally, an intercity express service would offer faster speeds, lower fares and more direct service between major hubs—from New Haven to Trenton, and from Poughkeepsie to Ronkonkoma.

All of these services would be overlaid in a Trans-Regional Express (T-REX) system that combines the territories of all three commuter railroads, and complements and connects to the New York City subways and PATH.

In much of the region, the service would provide a consistent level of service: every 15 minutes throughout the day and every 10 minutes during the traditional peak periods. Such a schedule would reduce the physical stress placed on the system and allow it to be used throughout the day as a viable transit option.

The system could be managed either by combining the existing railroads into one operating agency, or by creating a regional coordinating entity that would be responsible for coordinating schedules, fares, and operations among the three railroads. The service could be operated by the existing public authorities or by private concessions, such as the London Overground.



Outcomes
The regional rail proposal would dramatically increase rail capacity across the Hudson River, provide additional layers of redundancy for the region’s transit system, and bring rail service to currently unserved areas of New Jersey. It would improve the region’s rail service by standardizing fares, headways, service routings, rolling stock, and transfer arrangements to create a coherent and integrated system. Travel times would be reduced from well over an hour to less than half an hour for many commuters, and traveling would be far more predictable. The system as a whole would be significantly more resilient with multiple options for rerouting service or taking alternative routes. As a result, the region would be able to attract and sustainably accommodate far more economic growth. Many residents who can’t reach or afford rail service today would be able to use it on a regular basis.



Paying for It

The system would be built out over several decades. The cost of the tunnel is likely to be in line with costs for other rail projects in the New York City region, although these costs are likely to change over the different phases of the project. Without reforms to bring down project costs, it will be nearly impossible to afford these improvements. However, implementing this regional rail program does provide opportunities for savings from economies of scale and standardized construction practices, and by obviating the need for other projects. For example, the regional rail system would result in a smaller bus terminal than currently planned, and could obviate the need for the southern portion of the Second Avenue Subway, saving tens of billions of dollars. The sources of revenue would need to include substantial federal revenue, as well as dedicated revenue from new sources, such as mileage-based fees for automobile and truck travel or carbon pricing that could provide revenue for a range of transportation projects.



Post a New Response

(1456702)

view threaded

Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system

Posted by Olog-hai on Fri Dec 1 11:37:09 2017, in response to RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system, posted by GojiMet86 on Fri Dec 1 10:23:22 2017.

What a joke.

They need to move the station southward, to perhaps Houston Street, so it can connect instead to NJT's Hoboken Division and LIRR's Bushwick Branch. They'll need to un-abandon and modify the Montauk Cutoff to send trains to Sunnyside though.

Post a New Response

(1456735)

view threaded

Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system

Posted by Joe V on Fri Dec 1 17:43:50 2017, in response to Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system, posted by Olog-hai on Fri Dec 1 11:37:09 2017.

They have Vuchic/ SEPTA disease.

LIRR has enough problems, but imagine them linking up their services with a schlock outfit like NJT.


Post a New Response

(Sponsored)

iPhone 6 (4.7 Inch) Premium PU Leather Wallet Case - Red w/ Floral Interior - by Notch-It

(1456737)

view threaded

Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system

Posted by Andrew Saucci on Fri Dec 1 19:02:07 2017, in response to RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system, posted by GojiMet86 on Fri Dec 1 10:23:22 2017.

One can imagine the foam on the mouths of the authors of this dream.

Post a New Response

(1456739)

view threaded

Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system

Posted by Joe V on Fri Dec 1 19:30:41 2017, in response to Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system, posted by Andrew Saucci on Fri Dec 1 19:02:07 2017.

Railfans with planner degrees (who could not put together an N-Track layout).

Post a New Response

(1456741)

view threaded

Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system

Posted by Olog-hai on Fri Dec 1 19:45:01 2017, in response to Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system, posted by Andrew Saucci on Fri Dec 1 19:02:07 2017.

I think I found 'em.



Post a New Response

(1456742)

view threaded

Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system

Posted by Olog-hai on Fri Dec 1 19:49:49 2017, in response to Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system, posted by Joe V on Fri Dec 1 17:43:50 2017.

Resurrecting the notion of light rail along the Erie Newark Branch is a no-go. That died quickly in the early 2000s.

Never mind stupid names such as this:
Trans-Regional Express (T-REX)
Srsly? Even Marc Bolan has to laugh at that.



Post a New Response

(1456743)

view threaded

Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system

Posted by Olog-hai on Fri Dec 1 19:54:01 2017, in response to RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system, posted by GojiMet86 on Fri Dec 1 10:23:22 2017.

Well, I will say this: that last graphic does have the notion of building the Atlantic Avenue line into Manhattan (finally). The "Harlem Express Tunnel" does have me in stitches, though; will they reactivate the old underground 125th Street Station that's underneath the current Metro-North station too?

Post a New Response

(1456762)

view threaded

Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system

Posted by JayZeeBMT on Sat Dec 2 07:19:39 2017, in response to Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system, posted by Olog-hai on Fri Dec 1 19:49:49 2017.

I get the overwhelming impression that the kids who created this overview grew up watching Jurassic Park.

T-Rex????

However, I can see some merit in their ideas.

Post a New Response

(1456769)

view threaded

Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system

Posted by Olog-hai on Sat Dec 2 10:12:21 2017, in response to Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system, posted by JayZeeBMT on Sat Dec 2 07:19:39 2017.

Enough money has been spent on ESA already to build a tunnel through Downtown and join it to the Atlantic Avenue branch.

And at least in one of the ideas, they have the semblance of a Union Station, although they join it to the Atlantic Avenue line and not the Bushwick Branch and Lower Montauk. They keep a station at Hoboken.

Post a New Response

(1456770)

view threaded

Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system

Posted by pragmatist on Sat Dec 2 10:17:03 2017, in response to Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system, posted by JayZeeBMT on Sat Dec 2 07:19:39 2017.

T-Rex name was already used for major projects in the Denver area...

Post a New Response

(1456771)

view threaded

Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system

Posted by Olog-hai on Sat Dec 2 10:24:32 2017, in response to Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system, posted by pragmatist on Sat Dec 2 10:17:03 2017.

The estate of Marc Bolan should sue.

Post a New Response

(1456773)

view threaded

Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system

Posted by Olog-hai on Sat Dec 2 11:11:44 2017, in response to RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system, posted by GojiMet86 on Fri Dec 1 10:23:22 2017.

Combine three commuter rail systems into one network

BS. Centralization means less service overall, not more.

Post a New Response

(1456781)

view threaded

Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system

Posted by Joe V on Sat Dec 2 13:00:16 2017, in response to Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system, posted by Olog-hai on Sat Dec 2 11:11:44 2017.

I don't know about less, but is does mean shitty - delays on one system automatically magnify to the other. Planners for some reason all get big dicks about thru-running.

If Amtrak dispatchers dick around with an inbound SEPTA train from Trenton or Wilmington, everyone waiting to go to Chestnut Hill East and Warminster will be late.



Post a New Response

(1456787)

view threaded

Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system

Posted by Jackson Park B Train on Sat Dec 2 14:07:13 2017, in response to RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system, posted by GojiMet86 on Fri Dec 1 10:23:22 2017.

A few grains worth saving from all of the dross. We DO need more coverage and critcally, better connectivity.

As to through-routing, yes the longer the route the greater the potential for cascading delays. That said, through stations are de facto more efficient than terminals. Compare the throughput potential of City Hall on the 6 to that of 8th Ave on the L. Balancing the two branches is always a challenge--CTA switched the Dan Ryan to being the south end of what is now the Red Line because ridership more closely mirrored ridership north of the Loop to Howard.

Post a New Response

(1456816)

view threaded

Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system

Posted by randyo on Sat Dec 2 19:17:31 2017, in response to Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system, posted by Joe V on Fri Dec 1 17:43:50 2017.

Although I don't agree with all of the RPA’s recommendations, especially the overnight closure of the NYCTS, It might not be a bad idea to have a truly regional commuter RR system which would include NJT, MN and LIRR. Its success would be contingent however on having COMPETENT (and I do mean COMPETENT) and exhaustively encyclopedically knowledgable management to run the mega agency, no excuses accepted!!!!!

Post a New Response

(1457577)

view threaded

Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system

Posted by JAFO on Sat Dec 9 17:21:24 2017, in response to RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system, posted by GojiMet86 on Fri Dec 1 10:23:22 2017.

reading the latest RPA plans gave me another idea for NJT in LIRR territory

instead of a new e river tunnel from the s penn, run these tunnels eastwards and up park ave to connect with the tail tracks of ESA, thereby giving NJT access to GCT, east side and sunnyside to layup their trains mid-day between the AM and PM peak times

LIRR could get a simiar arrangement to use of the Hudson tunnels (new or old) to do their mid-day layup in NJ




Post a New Response

(1457581)

view threaded

Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system

Posted by Joe V on Sat Dec 9 18:33:54 2017, in response to Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system, posted by JAFO on Sat Dec 9 17:21:24 2017.

63rd Street tunnels cannot clear anything taller than a 12'11" high MU.
Forget NJT going there.

Why should LIRR lay up in New Jersey when they can layup in West Side yard ? There's sufficient reverse peak NJT trains as it is to Newark, the only likely place a LI commuter would want to go in New Jersey that is served by NJT. .

Post a New Response

(1457780)

view threaded

Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system

Posted by JAFO on Sun Dec 10 19:02:22 2017, in response to Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system, posted by Joe V on Sat Dec 9 18:33:54 2017.

by the time the gateway tunnels , penn S. , and "e. gateway to gtc" tunnels is built, the next generation of njtransit fleet can be built to fit thru the 63rd st tunnels (rumour has lirr has some parts of their fleet that may not fit either).

can metronorth fleet do so too?

isn't the west side yard near capacity already?

i can't see how the s. penn trains can get to west side yard to layup

Post a New Response

(1457818)

view threaded

Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system

Posted by Olog-hai on Sun Dec 10 21:08:58 2017, in response to Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system, posted by JAFO on Sun Dec 10 19:02:22 2017.

the next generation of njtransit fleet can be built to fit thru the 63rd st tunnels

LOL! That would never happen. It's like expecting the LIRR to build another fleet to be compatible with IRT dimensions, and the Atlantic Avenue line to run into the IRT at Flatbush as was originally planned.

can metronorth fleet do so too?

Question is moot. Third rail not compatible.



Post a New Response

(1457846)

view threaded

Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system

Posted by randyo on Mon Dec 11 01:28:28 2017, in response to Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system, posted by Olog-hai on Sun Dec 10 21:08:58 2017.

I believe there are some pieces of equipment that have 3rd rail shoes that can operate on both types of 3rd rail.

Post a New Response

(1457851)

view threaded

Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system

Posted by Olog-hai on Mon Dec 11 02:25:45 2017, in response to Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system, posted by randyo on Mon Dec 11 01:28:28 2017.

Those won't fit in the 63rd Street Tunnel.

And who knows how long they'll work anyway; not that they'll be going to NYP to/from the New Haven Line like the politicians keep claiming they will. For NYP service (if they ever get the room; and they won't), Shoreliners with either ALP-46s or ACS-64s are a better bet.

Post a New Response

(1457864)

view threaded

Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system

Posted by MainR3664 on Mon Dec 11 07:42:13 2017, in response to RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system, posted by GojiMet86 on Fri Dec 1 10:23:22 2017.

Stuff of dreams. I like it- but it ain't gonna happen. We'll get Phase 2 of the SAS- if we're lucky. That's it, at best.

Post a New Response

(1457919)

view threaded

Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system

Posted by Mitch45 on Mon Dec 11 15:11:52 2017, in response to RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system, posted by GojiMet86 on Fri Dec 1 10:23:22 2017.

Instead of doing all this, why not first try to improve the lot of transit riders by reopening and restoring closed parts of the system?

Post a New Response

(1457951)

view threaded

Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system

Posted by Joe V on Mon Dec 11 17:42:35 2017, in response to Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system, posted by JAFO on Sun Dec 10 19:02:22 2017.

Do you understand how high 12'10" is ? With a locked down pantograph, the best you can do is run a high side gondola car.

Forget about.

MN M7A's won't fit with that air duct on the roof.

When LIRR pulls 40% of their train out of NYPS, the WSY is longer filled to the brim.

Why would a "South Penn" train need to go to the WSY ? They will simply run back to New Jersey. There is no excuse to send LIRR trains to NJ there as well.

Post a New Response

(1457952)

view threaded

Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system

Posted by Joe V on Mon Dec 11 17:44:13 2017, in response to Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system, posted by Olog-hai on Mon Dec 11 02:25:45 2017.

East Bronx service will be M-8's with over-sliding 3rd rail extended to "Gate" (Noprthern Blvd). Whether they get to use WSY is for MN, Amtrak, and LIRR to fight over.

Post a New Response

(1457974)

view threaded

Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system

Posted by Olog-hai on Mon Dec 11 23:31:35 2017, in response to Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system, posted by Joe V on Mon Dec 11 17:44:13 2017.

That'll never happen.

Post a New Response

(1457975)

view threaded

Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system

Posted by Olog-hai on Mon Dec 11 23:32:19 2017, in response to Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system, posted by Joe V on Mon Dec 11 17:42:35 2017.

When LIRR pulls 40% of their train out of NYPS

They won't do that.

Post a New Response

(1457977)

view threaded

Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system

Posted by Olog-hai on Mon Dec 11 23:34:28 2017, in response to Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system, posted by Mitch45 on Mon Dec 11 15:11:52 2017.

Specifically which?

And how would that get them to/from Manhattan?

Post a New Response

(1458054)

view threaded

Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system

Posted by Joe V on Tue Dec 12 17:51:50 2017, in response to Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system, posted by Olog-hai on Mon Dec 11 23:32:19 2017.

Yes they will. Do you think they have unlimited operating subsidies to run many rush hour more trains, or even a market ?

Post a New Response

(1458072)

view threaded

Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system

Posted by Olog-hai on Tue Dec 12 19:15:58 2017, in response to Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system, posted by Joe V on Tue Dec 12 17:51:50 2017.

No they won't pull 40 percent out. There isn't enough room in ESA to do that. And they aren't about to give up slots to anyone else.

Post a New Response

(1458077)

view threaded

Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system

Posted by Andrew Saucci on Tue Dec 12 19:25:45 2017, in response to RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system, posted by GojiMet86 on Fri Dec 1 10:23:22 2017.

I've been thinking-- about the only thing not in there is a reactivation of the LIRR Central branch through Levittown.

Post a New Response

(1458082)

view threaded

Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system

Posted by Joe V on Tue Dec 12 19:46:20 2017, in response to Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system, posted by Olog-hai on Tue Dec 12 19:15:58 2017.

ESA is 23 TPH.

Post a New Response

(1458096)

view threaded

Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system

Posted by Henry R32 #3730 on Tue Dec 12 20:36:55 2017, in response to Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system, posted by Joe V on Tue Dec 12 17:51:50 2017.

They do have demand for additional rush hour trains. What they have been lacking to meet that demand is:
1. Western terminal capacity, which ESA will help with
2. Insufficent main line trackage, which is partially being addressed
3. Insufficient parking. The surface lots in Ronkonkoma need to be replaced with a large parking garage, as do many other stations in electrified territory. There doesn't seem to be much planning going on for this - I think Mineola was the last garage LIRR opened, there need to be more further east.

Post a New Response

(1458097)

view threaded

Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system

Posted by Henry R32 #3730 on Tue Dec 12 20:46:07 2017, in response to Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system, posted by Olog-hai on Mon Dec 11 02:25:45 2017.

And who knows how long they'll work anyway;

The M8 style shoes were fitted on several LIRR M7s and have been run in daily service for months. They've been well tested on both types of third rail.

The NYP service is coming. The amount of additional third rail that would need to be laid to reach 60hz overhead amounts to about half a mile.

Though I do agree a purchase of a few off-the-shelf electric engines would have been a simpler technical solution, operationally the New Haven Line west of Stamford is almost entirely MU. Having to suddenly tiptoe around what can go into NYP versus GCT (since neither would be able to do both) would create operational inefficiencies.

Post a New Response

(1458107)

view threaded

Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system

Posted by Olog-hai on Tue Dec 12 21:25:58 2017, in response to Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system, posted by Henry R32 #3730 on Tue Dec 12 20:46:07 2017.

The M8 style shoes were fitted on several LIRR M7s and have been run in daily service for months

Not in the service they're intending them for. And of course, not years.

The NYP service is coming

No it isn't. Don't count your chickens.

Post a New Response

(1458110)

view threaded

Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system

Posted by Olog-hai on Tue Dec 12 21:34:21 2017, in response to Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system, posted by Andrew Saucci on Tue Dec 12 19:25:45 2017.

I'd like to see that, even with a tunnel from East Garden City under East Meadow (Meadowbrook Parkway and even Eisenhower Park) to Levittown. It'd do away with that notion of a third track on the Main Line.

Post a New Response

(1458129)

view threaded

Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system

Posted by Joe V on Wed Dec 13 07:10:59 2017, in response to Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system, posted by Henry R32 #3730 on Tue Dec 12 20:36:55 2017.

Rush hour ridership has been overall flat for 20 years. Long Beach, Far Rockaway, and Hempstead have all lost rush hour trains over the years. The only additional trains to Manhattan you will see are a round trip to Ronkonkoma, Port Washington, diverted Brooklyn trains, and the pair of electric Hunterspoint trains.

Post a New Response

(1458130)

view threaded

Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system

Posted by Joe V on Wed Dec 13 07:13:17 2017, in response to Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system, posted by Henry R32 #3730 on Tue Dec 12 20:46:07 2017.

https://www.google.com/maps/d/viewer?msa=0&mid=17_5gxc-D6E8Nv5SDvm_iuCn1s4s&ll=40.76168296491464%2C-73.92679450000003&z=13

Post a New Response

(1458133)

view threaded

Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system

Posted by Broadway Lion on Wed Dec 13 11:06:04 2017, in response to RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system, posted by GojiMet86 on Fri Dec 1 10:23:22 2017.

And they thought that my pans were off the wall!

ROARING

Post a New Response

(1458176)

view threaded

Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system

Posted by Olog-hai on Wed Dec 13 18:12:24 2017, in response to Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system, posted by Broadway Lion on Wed Dec 13 11:06:04 2017.

Do you hang your pans on the wall? Are they non-stick?

Post a New Response

(1458190)

view threaded

Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system

Posted by Henry R32 #3730 on Wed Dec 13 20:43:59 2017, in response to Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system, posted by Joe V on Wed Dec 13 07:13:17 2017.

Thanks for that! It looked closer on checkthedoorlight's old map (third rail went farther and voltage change looked closer). I also wasn't expecting the .4 miles of overlap, but it makes sense since you absolutely do *not* want them to raise the pans early/drop late...

That said, 1.3 miles total still isn't that big of a deal. A lot more third rail than that is going into the 2nd / 3rd main line tracks...

Post a New Response

(1458191)

view threaded

Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system

Posted by SMAZ on Wed Dec 13 23:41:17 2017, in response to Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system, posted by Olog-hai on Fri Dec 1 19:49:49 2017.

Never mind stupid names such as this:
Trans-Regional Express (T-REX)


The RPA man is crazy saying we're juvenile delinquent wrecks.
Oh man, I need Gateway when I got T-REX.

Post a New Response

(1458192)

view threaded

Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system

Posted by Olog-hai on Thu Dec 14 00:56:17 2017, in response to Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system, posted by SMAZ on Wed Dec 13 23:41:17 2017.

Perfect.

Ian Hunter is the only one left out of the singers that the song is concerned with (Bowie [composer] and Bolan). Hunter is 78 now.

Post a New Response

(1458193)

view threaded

Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system

Posted by Olog-hai on Thu Dec 14 02:08:39 2017, in response to Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system, posted by randyo on Sat Dec 2 19:17:31 2017.

It might not be a bad idea to have a truly regional commuter RR system which would include NJT, MN and LIRR

It would be a terrible idea. Centralization has made things progressively worse.

Its success would be contingent however on having COMPETENT (and I do mean COMPETENT) and exhaustively encyclopedically knowledgable management to run the mega agency

That never happens in government.

Post a New Response

(1458206)

view threaded

Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system

Posted by Joe V on Thu Dec 14 08:43:51 2017, in response to Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system, posted by Olog-hai on Thu Dec 14 02:08:39 2017.

People who believe in such regional systems are entirely caught up in moving equipment all over the place, and not concerned with people's trips.

If some poor schmuck want to go from Metuchen to Mineola, they can transfer at NYPS and do it now. There is also no guarantee that a LIRR system with 10 branches and an NJT with 7 major lines, producing 70 route permutations, that the few selected would satisfy any such person's itinerary. They wil stil wind up doign exactly what they do now - transfer enroute, if not at NYPS, then at Newark Broad, Newark Penn, Secaucus, NYPS, Jamaica, Babylon, or Hicksville.

There is no reason to spend billions re-engineer all the systems to be compatible and wreak havoc on service planning to make it work, and it won't work. SEPTA is a daily rolling disaster, lucky to have OTP on any route exceed 90%, after 35 years of practice to pacify Professor Vuchic's incessant whining.

Post a New Response

(1458220)

view threaded

Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system

Posted by SMAZ on Thu Dec 14 12:35:23 2017, in response to Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system, posted by Olog-hai on Thu Dec 14 00:56:17 2017.

I also like this rendition from THE Bruce Dickinson (though it could have used more cowbell). It's just a great song.





Post a New Response

(1458255)

view threaded

Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system

Posted by randyo on Thu Dec 14 16:47:23 2017, in response to Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system, posted by Olog-hai on Tue Dec 12 21:25:58 2017.

That’s what many on this forum said about the M/V combination.

Post a New Response

(1458271)

view threaded

Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system

Posted by randyo on Thu Dec 14 17:34:46 2017, in response to Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system, posted by Joe V on Thu Dec 14 08:43:51 2017.

What is needed is to put everyone’s feet to the fire so that legalized incompetence is not permitted and will be SEVERELY punished!

Post a New Response

(1458281)

view threaded

Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system

Posted by Joe V on Thu Dec 14 18:39:37 2017, in response to Re: RPA: The Fourth Regional Plan: Create a fully integrated, regional transit system, posted by randyo on Thu Dec 14 17:34:46 2017.

Get a PhD or Masters in Planning and they walk on water.