Re: Lower Montauk Branch Passenger Rail Study (Final Report 2018) could cost over $2 Billion (1465069) | |||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: Lower Montauk Branch Passenger Rail Study (Final Report 2018) could cost over $2 Billion |
|
Posted by LuchAAA on Sat Feb 10 00:53:53 2018, in response to Lower Montauk Branch Passenger Rail Study (Final Report 2018) could cost over $2 Billion, posted by gold_12th on Fri Feb 9 12:11:41 2018. Sounds like a plan.Originally this was supposed to connect to the 63rd tunnel in the mid-80's. If they can get this project off the ground and somehow connect to Manhattan, it would be worth it. |