Re: Lower Montauk Branch Passenger Rail Study (Final Report 2018) could cost over $2 Billion (1465419) | |||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: Lower Montauk Branch Passenger Rail Study (Final Report 2018) could cost over $2 Billion |
|
Posted by Joe V on Mon Feb 12 19:02:29 2018, in response to Re: Lower Montauk Branch Passenger Rail Study (Final Report 2018) could cost over $2 Billion, posted by gp38/r42 chris on Mon Feb 12 18:55:39 2018. They had tin sheds and lights. They also wanted to reduce running times as track deteriorated on the East End in the 1960's and 1970's. There was no motivation to do anything with the LIC local stops.The LIRR people who made these choices are dead. We can only speculate. |