Re: Lower Montauk Branch Passenger Rail Study (Final Report 2018) could cost over $2 Billion |
|
Posted by Andrew Saucci on Wed Feb 14 22:20:15 2018, in response to Re: Lower Montauk Branch Passenger Rail Study (Final Report 2018) could cost over $2 Billion, posted by Olog-hai on Tue Feb 13 12:09:14 2018. I'll guess that the connection from the Lower Montauk to 63 St would have been via a new tunnel underneath Sunnyside and Harold. Not the way I would have done it-- I would have planned a tunnel to 23 St, but by the time the 63 St tunnel was constructed, this was probably the sort of thinking going around. |