Re: Lower Montauk Branch Passenger Rail Study (Final Report 2018) could cost over $2 Billion (1465127) | |||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: Lower Montauk Branch Passenger Rail Study (Final Report 2018) could cost over $2 Billion |
|
Posted by ntrainride on Sat Feb 10 12:57:35 2018, in response to Re: Lower Montauk Branch Passenger Rail Study (Final Report 2018) could cost over $2 Billion, posted by Broadway Lion on Sat Feb 10 11:20:04 2018. ...connecting, down there, with the lirr via the atlantic ave line east river tunnel extension, said trains running to, oh, newark, nj penn station. screw it. add sleepers, cruise-train up the delaware river tobinghamton. thank you. |