Re: Lower Montauk Branch Passenger Rail Study (Final Report 2018) could cost over $2 Billion (1465468) | |||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: Lower Montauk Branch Passenger Rail Study (Final Report 2018) could cost over $2 Billion |
|
Posted by LuchAAA on Mon Feb 12 22:33:03 2018, in response to Re: Lower Montauk Branch Passenger Rail Study (Final Report 2018) could cost over $2 Billion, posted by Andrew Saucci on Sat Feb 10 23:00:56 2018. I think it would have had some stops.Or at some point would have had them added. Thinks about it. Had the "Super Express" gone in service circa 1988, residents and politicians along the line would have demanded stops in their neighborhood. |