Re: Lower Montauk Branch Passenger Rail Study (Final Report 2018) could cost over $2 Billion (1465406) | |||
![]() |
|||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
![]() |
Re: Lower Montauk Branch Passenger Rail Study (Final Report 2018) could cost over $2 Billion |
|
Posted by Joe V on Mon Feb 12 18:44:15 2018, in response to Re: Lower Montauk Branch Passenger Rail Study (Final Report 2018) could cost over $2 Billion, posted by gp38/r42 chris on Mon Feb 12 18:00:39 2018. Also, before they installed high level platforms at LIC, your walk to and from the subway was shorter. You climbed on the train from the ballast at the east end of the yard at the 2 closest tracks. |
![]() |
(There are no responses to this message.)
![]() |
![]() |