Home · Maps · About

Home > SubChat
 

[ Read Responses | Post a New Response | Return to the Index ]
[ First in Thread | Next in Thread ]

 

view flat

Re: Canarsie CBTC

Posted by Stephen Bauman on Thu Jun 9 21:45:28 2005, in response to Re: Canarsie CBTC, posted by tracksionmotor on Thu Jun 9 20:07:52 2005.

edf40wrjww2msgDetail:detailStr
One major problem yet to be addressed is detection and system
recognition of BROKEN RAILS.


Among the problems that CBTC does not address are broken rails, interlockings and foreign equipment (non-CBTC equipped) on the line. The solution is an auxillary wayside system. This system need only handle 4 tph (15 minute headways). This translates to 4 or 5 blocks for the entire Canarsie Line.

Responses

Post a New Response

Your Handle:

Your Password:

E-Mail Address:

Subject:

Message:



Before posting.. think twice!


[ Return to the Message Index ]