| Re: Canarsie CBTC (96869) | |||
|
|
|||
| Home > SubChat | |||
|
[ Read Responses | Post a New Response | Return to the Index ] |
|
||
Re: Canarsie CBTC |
|
|
Posted by Stephen Bauman on Thu Jun 9 21:45:28 2005, in response to Re: Canarsie CBTC, posted by tracksionmotor on Thu Jun 9 20:07:52 2005. One major problem yet to be addressed is detection and systemrecognition of BROKEN RAILS. Among the problems that CBTC does not address are broken rails, interlockings and foreign equipment (non-CBTC equipped) on the line. The solution is an auxillary wayside system. This system need only handle 4 tph (15 minute headways). This translates to 4 or 5 blocks for the entire Canarsie Line. |