Home · Maps · About

Home > SubChat
 

[ Read Responses | Post a New Response | Return to the Index ]
[ First in Thread | Next in Thread ]

 

view flat

Re: Re-Open LIRR 'White Pot Junction

Posted by Broadway Lion on Sat Mar 8 21:40:16 2008, in response to Re: Re-Open LIRR 'White Pot Junction, posted by GP38/R42 Chris on Sat Mar 8 20:10:26 2008.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
No it does not, and no you do not need to even use those bellmouths.

Let it follow the LIRR for a few hundred feet as it either ascends or descends to a new line (elevated or subway) but following the existing LIRR ROW. It would make local stops that the LIRR does not make, but they would be much further apart than older subway local stops. An elevated structure would get it over to the 63rd Street tunnel more easily, and then it could root out an accommodation with the (F) train through the upper level of said crossing.

You must erase from your heads, from your planning, connections with the existing subway system. IT IS MAXED OUT! (It just so happens that there *is* capacity in the 63rd for a BWAY EXP service. Thus the Nancy to Howard is possible.

If you do not *like* my plan, then take your plan, roll it up, stick it in your ear, and set fire to it.

ROAR

Responses

Post a New Response

Your Handle:

Your Password:

E-Mail Address:

Subject:

Message:



Before posting.. think twice!


[ Return to the Message Index ]