Home · Maps · About

Home > SubChat
 

[ Read Responses | Post a New Response | Return to the Index ]
[ First in Thread | Next in Thread ]

 

view flat

Re: May 11, 1975. . .End of the Culver shuttle

Posted by Chris R16/R2730 on Sat May 12 12:19:33 2007, in response to Re: May 11, 1975. . .End of the Culver shuttle, posted by GP38/R42 Chris on Sat May 12 01:55:59 2007.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d

The annoying this is that they tore the structure down less than a year before the M was removed from the Brighton line. I doubt that they could have used it immediatley, but as the routing of the M down the West End became more and more permanent, and the changing of attitudes away from closure and demolition to that of rehabilitation in the latter part of the 1980's, the logic of having the M serve a rebuilt line would have been easy to see. The only thing which would have made it difficult was the enormous cost rebuilding the el structure would bring. Basically, it needed new everything and would have had to have been stripped down to a steel skeleton and rebuilt from there.

Responses

Post a New Response

Your Handle:

Your Password:

E-Mail Address:

Subject:

Message:



Before posting.. think twice!


[ Return to the Message Index ]