Posted by randyo on Wed Nov 26 12:27:36 2014, in response to Re: The Time for Reactivation of the Rockaway Beach Line is Now, posted by 3-9 on Tue Nov 25 23:39:43 2014. Since the bellmouths are already in place from the local tracks, the entire subway infrastructure would have to be widened similarly to what was done N/O Qns Plz in order to provide access to both exp and lcl tks and that would drive up the cost of building the connection making it less desirable. |
![]() |
![]() |
![]() |