Re: The Time for Reactivation of the Rockaway Beach Line is Now |
|
Posted by 3-9 on Tue Nov 25 23:39:43 2014, in response to Re: The Time for Reactivation of the Rockaway Beach Line is Now, posted by randyo on Tue Nov 25 18:47:03 2014. Why switch the M with the E? Just run the M to the Rockaways, and the G all the other times (run the M 7 days a week if weekend day time ridership warrants it).As for the bellmouths, it's probably better for the connections to rise up to the local and express tracks to connect with both. It would be more expensive, but it would be worth it. |
![]() |
![]() |
![]() |