Re: The Time for Reactivation of the Rockaway Beach Line is Now |
|
Posted by #5 - Dyre Ave on Tue Dec 2 13:38:52 2014, in response to Re: The Time for Reactivation of the Rockaway Beach Line is Now, posted by Wallyhorse on Tue Dec 2 12:58:30 2014. There is very little extra capacity on the 6th Ave Local tracks to handle the (F), (M) and a Rockaway Park (V), unless you run that (V) service on very infrequent headways. And QBL riders east of 71st Ave don't want local service. That's why the R to/from 179th didn't last very long.Better to extend the M to from the Rockaway Branch and leave the (F) and ® lines as they are now. |