Re: Queens Bus Network Redesign: Existing Conditions Report (335691) | |||
Home > BusChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: Queens Bus Network Redesign: Existing Conditions Report |
|
Posted by Joe V on Mon Sep 2 07:00:38 2019, in response to Re: Queens Bus Network Redesign: Existing Conditions Report, posted by Stephen Bauman on Mon Sep 2 06:54:55 2019. So farebox recovery for X buses is ~36%, local buses 13%, SBS 25%, subway 83%. But kill the the local and SBS buses, and the subway farebox recovery would drop like a brick due to lost riders. |