Re: Queens Bus Network Redesign: Existing Conditions Report (335703) | |||
Home > BusChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: Queens Bus Network Redesign: Existing Conditions Report |
|
Posted by checkmatechamp13 on Mon Sep 2 14:54:17 2019, in response to Re: Queens Bus Network Redesign: Existing Conditions Report, posted by Joe V on Mon Sep 2 11:27:03 2019. Bad math. That should be 48/(275+48) = 14.9% |
(There are no responses to this message.)