Re: Queens Bus Network Redesign: Existing Conditions Report (335765) | |||
Home > BusChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: Queens Bus Network Redesign: Existing Conditions Report |
|
Posted by Joe V on Thu Sep 5 16:54:57 2019, in response to Re: Queens Bus Network Redesign: Existing Conditions Report, posted by Snilcher on Thu Sep 5 16:52:40 2019. I was thinking of the Rockaway Peninsula. They don't want any pressure to run those trains anymore often than 20 - 24 minutes, when the #2 or 5 runs every 8 -10 minutes. |