| Re: Queens Bus Network Redesign: Existing Conditions Report (335765) | |||
|  | |||
| Home > BusChat | |||
| [ Read Responses | Post a New Response | Return to the Index ] | 
 | ||
|  | 
| Re: Queens Bus Network Redesign: Existing Conditions Report | |
| Posted by Joe V on Thu Sep 5 16:54:57 2019, in response to Re: Queens Bus Network Redesign: Existing Conditions Report, posted by Snilcher on Thu Sep 5 16:52:40 2019.I was thinking of the Rockaway Peninsula. They don't want any pressure to run those trains anymore often than 20 - 24 minutes, when the #2 or 5 runs every 8 -10 minutes. | 
|  | 
|  | 
|  |