Home · Maps · About

Home > BusChat
 

[ Read Responses | Post a New Response | Return to the Index ]
[ First in Thread | Next in Thread ]

 

view flat

Re: Summary and Video of November 2015 SBS meeting in Woodhaven

Posted by R30A on Tue Mar 15 12:01:43 2016, in response to Re: Summary and Video of November 2015 SBS meeting in Woodhaven, posted by BrooklynBus on Tue Mar 15 11:27:13 2016.

edf40wrjww2msgDetailB:detailStr
fiogf49gjkf0d
Not true. All along Cross bay there is no reduction in bus lanes."
Your statement is not true.
Two alternatives were put forth. One with narrowing the lanes and the other with keeping the lanes the same width but eliminating all left turn bays.
To accomplish to first, the speed limit would have to be lowered to 20 or 25 mph because faster speeds would not be safe. A tractor trailer currently barely fits into the existing traffic lanes.
The second option would greatly delay traffic as cars would be stuck vehicles d any car making a left turn at numerous cross streets.
The second option is what they appear to have picked. Not too big of an issue. Traffic on cross bay is roughly half what it is at the peak of Woodhaven, so I don't see why the left turns would be that big of an issue.

"To say lanes are not being removed throughout is plainly misleading since lanes are being removed for 3.5 out of the 4 miles between Queens Blvd and Rockaway Blvd,"
And why only count the 3.5 out of 4 miles between Queens Boulevard and Rockaway Boulevard? because it allows you to mislead? Oh wait! I know! because you are trying to make the number look artificially big. Either way, it is 3.3 out of those 4 miles. But... 3.3 out of the 10.8 total miles of the total Woodhaven-Cross Bay Blvd route. Who is being misleading here?

"Trottenberg stated that depending on the results of Phase 1, they will then decide whether or not to proceed with Phase 2. When I spoke to her on March 4th, I asked her why I never received a response to my letter suggesting they only go ahead with Phase 1 (with modifications) and drop Phase 2. She told me "you might get what your wish."
That doesn't sound to me like Phase 2 is a definite. The federal funds necessary have not yet been procured."
Sounds like a professional trying to assuage a nutjob that keeps annoying them.


Responses

Post a New Response

Your Handle:

Your Password:

E-Mail Address:

Subject:

Message:



Before posting.. think twice!


[ Return to the Message Index ]