Re: NJT conducting “Princeton Transitway Study” on Dinky ROW (1535898) | |
Home > SubChat |
[ Post a New Response | Return to the Index ]
Page 3 of 3 |
(1536645) | |
Re: NJT conducting “Princeton Transitway Study” on Dinky ROW |
|
Posted by Henry R32 #3730 on Sun Jan 26 02:55:24 2020, in response to Re: NJT conducting “Princeton Transitway Study” on Dinky ROW, posted by Olog-hai on Sun Jan 26 02:36:28 2020. Metro-North tickets, crew, and the service appeared on the LIRR departure board. |
|
(1536651) | |
Re: NJT conducting “Princeton Transitway Study” on Dinky ROW |
|
Posted by Olog-hai on Sun Jan 26 03:22:39 2020, in response to Re: NJT conducting “Princeton Transitway Study” on Dinky ROW, posted by Henry R32 #3730 on Sun Jan 26 02:55:24 2020. Red herrings. Where are the billions to even think of starting the service? Where are the crew qualifications, even test runs of their allegedly-NYP-capable M8s?There isn't even a start date for ESA opening; not that it's even linked to that. You'll see ACS-64s in Rensselaer before you see Metro-North anywhere near NYP. |
|
(1536652) | |
Re: NJT conducting “Princeton Transitway Study” on Dinky ROW |
|
Posted by AlM on Sun Jan 26 05:13:52 2020, in response to Re: NJT conducting “Princeton Transitway Study” on Dinky ROW, posted by Olog-hai on Sun Jan 26 03:22:39 2020. Where are the billions to even think of starting the service?Why is it billions if they use diesel-electric locomotives at each end? I know I was somewhat scoffing at that elsewhere in this thread, but not because it would cost billions. It wouldn't even cost anywhere near billions to install third rail down from Spuyten Duyvil. |
|
(Sponsored) |
iPhone 6 (4.7 Inch) Premium PU Leather Wallet Case - Red w/ Floral Interior - by Notch-It
|
(1536653) | |
Re: NJT conducting “Princeton Transitway Study” on Dinky ROW |
|
Posted by AlM on Sun Jan 26 05:16:13 2020, in response to Re: NJT conducting “Princeton Transitway Study” on Dinky ROW, posted by Olog-hai on Sun Jan 26 02:36:43 2020. $695 million in the capital plan |
|
(1536654) | |
Re: NJT conducting “Princeton Transitway Study” on Dinky ROW |
|
Posted by Henry R32 #3730 on Sun Jan 26 05:18:57 2020, in response to Re: NJT conducting “Princeton Transitway Study” on Dinky ROW, posted by Olog-hai on Sun Jan 26 03:22:39 2020. Where are the billions to even think of starting the service?Legitimate question, but NYS always seems to "find" money. Where are the crew qualifications, even test runs of their allegedly-NYP-capable M8s? A fair number of employees were qualified but even if not, that's not something to worry about until a year before opening. As for as the M8s, they've already tested the M8 3rd rail shoes on random LIRR M7s, So all they would need to test is the signalling capability. You'll see ACS-64s in Rensselaer before you see Metro-North anywhere near NYP. While I'd love for that to be the case, I'm pretty sure I'll see Metro-North in NYP within the 2020s, and catenary in Albany maybe in the 2050s. |
|
(1536655) | |
Re: NJT conducting “Princeton Transitway Study” on Dinky ROW |
|
Posted by Joe V on Sun Jan 26 07:06:06 2020, in response to Re: NJT conducting “Princeton Transitway Study” on Dinky ROW, posted by AlM on Sun Jan 26 05:13:52 2020. It will be with M-8's and over-sliding 3rd rail will be installed from Harold to GATE (about a mile) to avoid use of 25 cycle catenary. |
|
(1536656) | |
Re: NJT conducting “Princeton Transitway Study” on Dinky ROW |
|
Posted by Joe V on Sun Jan 26 07:08:13 2020, in response to Re: NJT conducting “Princeton Transitway Study” on Dinky ROW, posted by Olog-hai on Sun Jan 26 02:36:43 2020. They will use LIRR slots freed from ESA and not entirely back-filled with diverted Brooklyn and Hunterspoint electric trains. MTA told LIRR to release those slots. Helena Williams got fired for resisting with LI polticians' backing. |
|
(1536663) | |
Re: NJT conducting “Princeton Transitway Study” on Dinky ROW |
|
Posted by AlM on Sun Jan 26 09:11:57 2020, in response to Re: NJT conducting “Princeton Transitway Study” on Dinky ROW, posted by Joe V on Sun Jan 26 07:06:06 2020. I thought we were talking about the west side. |
|
(1536666) | |
Re: NJT conducting “Princeton Transitway Study” on Dinky ROW |
|
Posted by Olog-hai on Sun Jan 26 11:05:42 2020, in response to Re: NJT conducting “Princeton Transitway Study” on Dinky ROW, posted by Joe V on Sun Jan 26 07:06:06 2020. In other words, never. |
|
(1536667) | |
Re: NJT conducting “Princeton Transitway Study” on Dinky ROW |
|
Posted by Olog-hai on Sun Jan 26 11:07:07 2020, in response to Re: NJT conducting “Princeton Transitway Study” on Dinky ROW, posted by Joe V on Sun Jan 26 07:08:13 2020. There won't be any LIRR slots "freed". I don't see how you actually believe that railfan line.So where are the billions associated with this, eh? That's right; nowhere. |
|
(1536668) | |
Re: NJT conducting “Princeton Transitway Study” on Dinky ROW |
|
Posted by Olog-hai on Sun Jan 26 11:13:02 2020, in response to Re: NJT conducting “Princeton Transitway Study” on Dinky ROW, posted by Henry R32 #3730 on Sun Jan 26 05:18:57 2020. but NYS always seems to "find" moneyNot for this. If this were happening, the money would have been "found" ages ago, just like they kept "finding" money for ESA when it went well over double its original budget. Never mind no solid opening date for ESA. A fair number of employees were qualified but even if not, that's not something to worry about until a year before opening And your railroad managerial skills tell you this? Takes a lot of union negotiations and with Amtrak (the owner) before even getting to that stage. As for as the M8s, they've already tested the M8 3rd rail shoes on random LIRR M7s Not the same thing. One does not test such things on vehicles already running third rail full time, but only for those vehicles tested on. and catenary in Albany maybe in the 2050s LMAO! |
|
(1536669) | |
Re: NJT conducting “Princeton Transitway Study” on Dinky ROW |
|
Posted by Olog-hai on Sun Jan 26 11:14:08 2020, in response to Re: NJT conducting “Princeton Transitway Study” on Dinky ROW, posted by Osmosis Jones on Sat Jan 25 17:46:55 2020. I think that mixed-use public transit right-of-ways similar to what Downtown Seattle has is the future of transportationThey haven't expanded beyond Seattle. There's a reason for that. |
|
(1536672) | |
Re: NJT conducting “Princeton Transitway Study” on Dinky ROW |
|
Posted by italianstallion on Sun Jan 26 15:36:18 2020, in response to Re: NJT conducting “Princeton Transitway Study” on Dinky ROW, posted by Spider-Pig on Sat Jan 25 21:58:37 2020. Right. |
|
(1536673) | |
Re: NJT conducting “Princeton Transitway Study” on Dinky ROW |
|
Posted by italianstallion on Sun Jan 26 15:36:52 2020, in response to Re: NJT conducting “Princeton Transitway Study” on Dinky ROW, posted by AlM on Sun Jan 26 05:16:13 2020. Don't confuse him with facts. |
|
(1536674) | |
Re: NJT conducting “Princeton Transitway Study” on Dinky ROW |
|
Posted by italianstallion on Sun Jan 26 15:37:24 2020, in response to Re: NJT conducting “Princeton Transitway Study” on Dinky ROW, posted by Olog-hai on Sun Jan 26 11:07:07 2020. Capital plan, as posted by AlM. |
|
(1536692) | |
Re: NJT conducting “Princeton Transitway Study” on Dinky ROW |
|
Posted by Joe V on Mon Jan 27 07:09:38 2020, in response to Re: NJT conducting “Princeton Transitway Study” on Dinky ROW, posted by Olog-hai on Sun Jan 26 11:07:07 2020. That is the MTA Line and policy, not the "railfan line". LIRR slots are being transferred to MN.The money is in the MTA capital plan |
|
(1536703) | |
Re: NJT conducting “Princeton Transitway Study” on Dinky ROW |
|
Posted by Olog-hai on Mon Jan 27 11:59:30 2020, in response to Re: NJT conducting “Princeton Transitway Study” on Dinky ROW, posted by Joe V on Mon Jan 27 07:09:38 2020. No it is not. Things are still at the environmental assessment and preliminary design stage.There is less than $1 billion in the MTA '15-'19 "Capital Plan" for this so-called project—and LIRR already "borrowed" from its allocation to buy M9s. They are still "seeking" more money at this stage—a "proposed" $1.131 billion, and that won't be enough either knowing how these guys operate. All hot air. Can't believe you're actually falling for it. |
|
(1536716) | |
Re: NJT conducting “Princeton Transitway Study” on Dinky ROW |
|
Posted by Joe V on Mon Jan 27 14:54:30 2020, in response to Re: NJT conducting “Princeton Transitway Study” on Dinky ROW, posted by Olog-hai on Mon Jan 27 11:59:30 2020. So they will get that far, then say "never mind" I don't think so. |
|
(1536753) | |
Re: NJT conducting “Princeton Transitway Study” on Dinky ROW |
|
Posted by Olog-hai on Tue Jan 28 00:32:24 2020, in response to Re: NJT conducting “Princeton Transitway Study” on Dinky ROW, posted by Joe V on Mon Jan 27 14:54:30 2020. It's happened before with many other projects. If you think this is getting far, you're suffering from a severe case of doublethink. |
|
(1537337) | |
Re: NJT conducting “Princeton Transitway Study” on Dinky ROW |
|
Posted by ryanov on Wed Feb 5 03:02:29 2020, in response to Re: NJT conducting “Princeton Transitway Study” on Dinky ROW, posted by Olog-hai on Sun Jan 26 11:14:08 2020. Seattle also no longer has a mixed-use public transit right of way, if we're talking about the downtown tunnel. It went all light rail last year. |
|
(1537430) | |
Re: NJT conducting “Princeton Transitway Study” on Dinky ROW |
|
Posted by Osmosis Jones on Thu Feb 6 03:17:34 2020, in response to Re: NJT conducting “Princeton Transitway Study” on Dinky ROW, posted by ryanov on Wed Feb 5 03:02:29 2020. At the behest of the local government and not the riders. They spent a lot of money replacing a busway that was less than two decades old with... another slower busway that no one asked for. |
|
(1537431) | |
Re: NJT conducting “Princeton Transitway Study” on Dinky ROW |
|
Posted by Osmosis Jones on Thu Feb 6 03:21:01 2020, in response to Re: NJT conducting “Princeton Transitway Study” on Dinky ROW, posted by Osmosis Jones on Thu Feb 6 03:17:34 2020. *Three decades old. |
|
(1538490) | |
Re: NJT conducting “Princeton Transitway Study” on Dinky ROW |
|
Posted by Olog-hai on Mon Feb 17 11:40:14 2020, in response to Re: NJT conducting “Princeton Transitway Study” on Dinky ROW, posted by SUBWAYMAN on Sat Jan 25 23:20:49 2020. I already did, and I concluded you don't know what you're talking about, lol. |
|
Page 3 of 3 |