Re: NJT conducting “Princeton Transitway Study” on Dinky ROW (1536656) | |||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: NJT conducting “Princeton Transitway Study” on Dinky ROW |
|
Posted by Joe V on Sun Jan 26 07:08:13 2020, in response to Re: NJT conducting “Princeton Transitway Study” on Dinky ROW, posted by Olog-hai on Sun Jan 26 02:36:43 2020. They will use LIRR slots freed from ESA and not entirely back-filled with diverted Brooklyn and Hunterspoint electric trains. MTA told LIRR to release those slots. Helena Williams got fired for resisting with LI polticians' backing. |