Home · Maps · About

Home > SubChat
 

[ Read Responses | Post a New Response | Return to the Index ]
[ First in Thread | Next in Thread ]

 

view flat

Re: Wayne Transit Center to serve Boonton Line in January

Posted by Olog-hai on Tue Dec 18 16:31:14 2007, in response to Re: Wayne Transit Center to serve Boonton Line in January, posted by trainsarefun on Mon Dec 17 19:15:37 2007.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Another downside to electrifying NJCL, though, to be balanced, is that while it banishes diesels from the line, it might not do too much to decrease running times over the presently unelectrified stretch

Why not? Long Branch becomes a station stop instead of a layover spot, again. The electric motors still out-accelerate the diesels, so average speeds would rise (of course, if they could still run MUs there, the average speeds would get even better). If the improvements to the line are sufficient along with electrification, the 60-mph speed limit could come up to 80 mph to match the rest of the NJCL.

Responses

Post a New Response

Your Handle:

Your Password:

E-Mail Address:

Subject:

Message:



Before posting.. think twice!


[ Return to the Message Index ]