Re: Wayne Transit Center to serve Boonton Line in January |
|
|
Posted by AEM-7AC #901 on Tue Dec 18 18:03:17 2007, in response to Re: Wayne Transit Center to serve Boonton Line in January, posted by Olog-hai on Tue Dec 18 16:31:14 2007. The electric motors still out-accelerate the diesels, so average speeds would riseAnything to improve acceleration would help given the somewhat frequent station stops on the lower part of the line, and the periodic speed changes due to the drawbridges. If NJT could sprinkle some capital funds for higher speed drawbridges too... |