Re: Lower Montauk Branch Passenger Rail Study (Final Report 2018) could cost over $2 Billion (1525345) | |||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: Lower Montauk Branch Passenger Rail Study (Final Report 2018) could cost over $2 Billion |
|
Posted by Joe V on Sun Sep 29 11:52:26 2019, in response to Re: Lower Montauk Branch Passenger Rail Study (Final Report 2018) could cost over $2 Billion, posted by Stephen Bauman on Sat Sep 28 14:18:02 2019. Why does it have to a be be a subway ? There is such a thing as light rail, and the London Overground model of a hybrid commuter rail/rapid transit.There aren't going to be any more subways built in Queens. Lucky if there is ever an extension of the Nostrand subway or a Utica subway in Brooklyn. |