Home · Maps · About

Home > SubChat
 

[ Read Responses | Post a New Response | Return to the Index ]
[ First in Thread | Next in Thread ]

 

view flat

Re: Tour of East Side Abscess New LIRR Terminal Taking Shape Beneath Grand Central Terminal

Posted by Henry R32 #3730 on Thu Nov 1 09:11:21 2018, in response to Re: Tour of East Side Abscess New LIRR Terminal Taking Shape Beneath Grand Central Terminal, posted by Joe V on Thu Nov 1 08:57:23 2018.

They could have put 5 doors per 75' car to solve the ingress/egress issue. 4 cars with 5 doors = 5 cars with 4 doors.

The added benefit is the 4 extra seats (and associated standing space) per half train due to one less bulkhead wasting space. Current setup (one side of car):
[cab-6-6-6-2|2-6-6-6-2|2-6-6-6-2|2-6-6-6-2|2-6-6-6-cab]
212 seats per 5 car 60' set.
75' variant:
[cab-6-6-6-6-2|2-6-6-6-6-2|2-6-6-6-6-2|2-6-6-6-6-cab]
216 seats per 4 car 75' set.

This makes for 8 extra seats per train. Discarded over some weird flexibility fetish which will never be used for the lifetime of the cars.

Responses

Post a New Response

Your Handle:

Your Password:

E-Mail Address:

Subject:

Message:



Before posting.. think twice!


[ Return to the Message Index ]