Re: Tour of East Side Abscess New LIRR Terminal Taking Shape Beneath Grand Central Terminal (1491573) | |||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: Tour of East Side Abscess New LIRR Terminal Taking Shape Beneath Grand Central Terminal |
|
Posted by Henry R32 #3730 on Thu Nov 1 22:04:39 2018, in response to Re: Tour of East Side Abscess New LIRR Terminal Taking Shape Beneath Grand Central Terminal, posted by Joe V on Thu Nov 1 20:27:11 2018. Indeed. But after I posted I realized that they could have also gotten rid of most of the R32s all the same and had the R44s on the C. If they wanted to keep the C with short trains they could have put the R44s on the A and used the R46s on the C (since some are in pairs) to make 450' trains.When the dust settled instead of 5 trains of R42 in the east ~20 trains of R32 on 8th ave, there would have been 5 trains of R32 in the east and the A/C would be all R44/46. |