Home · Maps · About

Home > SubChat
 

[ Read Responses | Post a New Response | Return to the Index ]
[ First in Thread | Next in Thread ]

 

view flat

Re: Second Av Subway Ridership Growing Rapidly

Posted by Michael549 on Wed Feb 1 16:43:54 2017, in response to Re: Second Av Subway Ridership Growing Rapidly, posted by Stephen Bauman on Wed Feb 1 15:49:16 2017.

edf40wrjww2msgDetail:detailStr
There are several assumptions that you are making but I am only going to point to one of them.

Your words in context:

"Let's assume that all the SAS entries would have used the downtown Lex. The same load levels could have been achieved with the addition of a max of 7 tph on the local track during the peak 8-9am hour.

These extra trains could have been short turned at 3rd Ave-138th St.
The running time between 3rd Ave-138th St and Brooklyn Bridge is 37
minutes or 75 minutes (1.25 hrs) for the round trip."

---

I question your statement: "These extra trains could have been short turned at 3rd Ave-138th St."

In the midst of the #6 Pelham Bay Express trains using the middle track and merging west of the station to the downtown track along with Parkchester local trains - a series of trains are also supposed to use the middle track/platform to terminate and relay trains at the peak am rush hour periods. I doubt it.

Mike



Responses

Post a New Response

Your Handle:

Your Password:

E-Mail Address:

Subject:

Message:



Before posting.. think twice!


[ Return to the Message Index ]