Re: And the R-179 contract goes to.... |
|
Posted by randyo on Wed Mar 28 14:22:38 2012, in response to Re: And the R-179 contract goes to...., posted by R30A on Tue Mar 27 22:35:42 2012. If that were the case, then the R would have to be all R-160/179 and that would require the transfer of the remaining R-46s to other lines like possibly the C which would then require the C to be 600 ft trains. |