| Future phases of SAS (557986) | |||
|
|
|||
| Home > SubChat | |||
|
[ Read Responses | Post a New Response | Return to the Index ] |
|
||
Future phases of SAS |
|
|
Posted by Wallyhorse on Wed Jan 23 07:24:21 2008, in response to Re: M-V combo, posted by SMAZ on Wed Jan 23 03:57:31 2008. Exactly:A lot can change between now and the time it is to actually build the lower Manhattan portion of the SAS, which won't be for probably another 10-12 years at least. By that time, it's very possible people will see the light into having a connection to the Nassau Street line from the SAS, especially since by then people will likely realize such a connection would be very useful to relieve pressure from the 4/5 in lower Manhattan as well as give an alternate route to Brooklyn should any of the Broadway lines need to be re-routed via 2nd Avenue once the line to Houston is complete for example. |