Re: Future phases of SAS |
|
|
Posted by Wallyhorse on Tue Jan 29 07:52:50 2008, in response to Re: Future phases of SAS, posted by R160 8818 on Mon Jan 28 21:02:33 2008. That has been my point all along!!The connection the way it would ideally be done would be to have the SAS join the Nassau Street line at The Bowery, and then proceed to Canal Street, where it would be a HUGE transfer point (and I'm sure a lot of people who work for the Manhattan DA's Office would LOVE that in particular since there is an exit at Walker and Centre Streets from the J/M/Z station at Canal that is only a couple of blocks from the Manhattan courts and the DA's Office at Hogan Place). Canal and Fulton would be HUGE transfer points for a Nassau Branch of the SAS. The Water Street branch of the SAS still should be built, but I would build the Nassau Street connection first, and preferably from Houston as an add-on to Phase 3. |