Re: London Overground |
|
|
Posted by Rail Blue on Mon Sep 11 09:02:08 2006, in response to Re: London Overground, posted by Wado MP73 on Sun Sep 10 13:32:06 2006. What uses the dual-electrified section between Primrose Hill Junction - Camden Road East Junction? Goods?Yes. At CREJ the AC (north pair) and DC (south pair) Lines split. Only the DC Lines have platforms (and should of course continue to Broad St instead of merging into the AC Lines at Dalston Western Junction). The goods trains mainly continue to Stratford HL and the GE Main Line. My Network Southeast book shows a picture of a single non-electrified track next to the District line tracks at Barking. I think P1 (the terminal platform from the branch at Barking) may be non-electrified. The link to the Tilbury Line platforms most certainly is electrified. |