Re: (M) train during (L) tunnel closure |
|
Posted by Wallyhorse on Sat Apr 30 03:16:50 2016, in response to Re: (M) train during (L) tunnel closure, posted by Dupont Circle Station on Sat Apr 30 01:59:47 2016. Your CarnarsieOne other solution on weekends and holidays during the (L) shutdown might be to do this (when fewer TPH are running overall and can more easily allow this): The (C) re-route noted above (with the (L) cut back as also noted above). The (E) extended to Euclid to replace the (C) on Fulton on weekends. As long as CBTC on QB is not an issue, the split M/T that I would be looking at doing anyway (with the (T) only during overnights). |