Home · Maps · About

Home > SubChat
 

[ Read Responses | Post a New Response | Return to the Index ]
[ First in Thread | Next in Thread ]

 

view flat

Re: SI Railway - no new cars till 2020 - NY1 video

Posted by WillD on Sat Aug 29 22:49:34 2015, in response to Re: SI Railway - no new cars till 2020 - NY1 video, posted by ElectricTraction on Fri Aug 28 21:46:08 2015.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
I'm not as familiar with the B division cars, but the A division cars on the Lex Ave take off like a rocket ship.

No, they don't. At least not to any greater degree than the R160s do.

And the M-8's, while FRA heavy rail, are pretty close to that, and they weigh a lot more than any subway or rapid transit car.

The fact that you think that, despite the M8s accelerating at 2mph/s, one third the acceleration of a HBLR Kinki-Sharyo LRV (and most LRVs, PCCs, and so on), shows just how flawwed attempts to determine acceleration through qualitative observations are.

If SIR has a power issue that stops them from running rocketship-like trains, then upgrade the substations.
...
Electric railroads should not be operated around the limits of their power supplies. Their power supplies should be upgraded to support the worst-case scenario imaginable in terms of power draw.

Unfortunately there is a limited amount of money to go around. Replacing the rectifier/transformer sets in the substations to increase capacity at a time when the rolling stock is due for replacement may be needlessly expensive. Additionally there is a safety aspect to limiting the current that can be drawn through the substation equipment.

Responses

Post a New Response

Your Handle:

Your Password:

E-Mail Address:

Subject:

Message:



Before posting.. think twice!


[ Return to the Message Index ]