Home · Maps · About

Home > SubChat
 

[ Read Responses | Post a New Response | Return to the Index ]
[ First in Thread | Next in Thread ]

 

view flat

Re: QueensWay gets $444,000 grant form NY State to design the first phase

Posted by NIMBYkiller on Thu Dec 18 22:11:14 2014, in response to Re: QueensWay gets $444,000 grant form NY State to design the first phase, posted by steamdriven on Thu Dec 18 14:26:49 2014.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
I'm a huge fan of using exisiting LIRR infrastructure to expand rail service in the outter boros. The problem is west end capacity, especially since LIRR is fixated on severing FBA. If it was possible, I'd do the following routes every 20 mins at full time city ticket fare:

Bayside-NYP/GCT (all stops including Willets Point since they'll be developing the iron triangle)

Belmont Park-NYP/GCT (all stops including a reopened Hillside station). This would require rebuilding of Queens interlocking into a flyover that would allow westbound trains coming out of Belmont as well as Hempstead to cross over to the correct side without fouling any other tracks on the main

Valley Stream-NYP/GCT via Far Rock/Long Beach branch (all stops with a new stop built at Linden Blvd)

Freeport/West Hempstead-NYP/GCT via Montauk branch (all stops except Valley Stream and Rosedale with Springfield Blvd stop maybe reopened)

Any stops served outside the city zone will retain whatever zone ticketing they have (mostly zone 4)

Responses

Post a New Response

Your Handle:

Your Password:

E-Mail Address:

Subject:

Message:



Before posting.. think twice!


[ Return to the Message Index ]