Home · Maps · About

Home > SubChat

[ Post a New Response | Return to the Index ]

(909611)

view threaded

Weekend 7 line G.O. work has been scrapped - - really.

Posted by Newkirk Plaza David on Tue Mar 9 11:55:34 2010

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Yes really, the remaining three weekends of 7 line work has been "scrapped" - - work has been completed early and normal weekend 7 service to/from Manhattan is expected starting this weekend.

Post a New Response

(909620)

view threaded

Re: Weekend 7 line G.O. work has been scrapped - - really.

Posted by arnine on Tue Mar 9 12:09:31 2010, in response to Weekend 7 line G.O. work has been scrapped - - really., posted by Newkirk Plaza David on Tue Mar 9 11:55:34 2010.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Great news thanks for sharing :)

Post a New Response

(909622)

view threaded

Re: Weekend 7 line G.O. work has been scrapped - - really.

Posted by ClearAspect on Tue Mar 9 12:14:59 2010, in response to Weekend 7 line G.O. work has been scrapped - - really., posted by Newkirk Plaza David on Tue Mar 9 11:55:34 2010.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
They did an amazing amount of work for some of the G.O.s they had upwards of 25 work trains, all of them working quite hard, replacing track, replacing ballast, installing rails, chipping away concrete etc. There's still a lot of work left though on the 7, and I mean a lot of work, the track sections north of 45th road are old and need replacement, the queens blvd viaduct trackage is nearly 40 years old and will need replacement, and some track sections between Vernon-Jackson and Times Square need to be chipped out and replaced. But a lot of work has been done in critical areas and most of the tracks along the Roosevelt Avenue portion of the route has been replaced. However once done, then CBTC installation G.O.s begin. So Flushing residents have a long road ahead of them but in turn will get very very reliable service in the near future.

Post a New Response

(Sponsored)

iPhone 6 (4.7 Inch) Premium PU Leather Wallet Case - Red w/ Floral Interior - by Notch-It

(909625)

view threaded

Re: Weekend 7 line G.O. work has been scrapped - - really.

Posted by Newkirk Plaza David on Tue Mar 9 12:29:12 2010, in response to Re: Weekend 7 line G.O. work has been scrapped - - really., posted by ClearAspect on Tue Mar 9 12:14:59 2010.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Didn't they replaced the tracks during both QB viaduct projects in 1985-89 and mid 1990's?

Post a New Response

(909626)

view threaded

Re: Weekend 7 line G.O. work has been scrapped - - really.

Posted by ClearAspect on Tue Mar 9 12:36:26 2010, in response to Re: Weekend 7 line G.O. work has been scrapped - - really., posted by Newkirk Plaza David on Tue Mar 9 12:29:12 2010.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Yes, and I was taught that el track panels have a life span of 30-40 years, depending on the type of wood used (amazingly there is a type of wood thats highly expensive but has a life span nearly 50 years!!!) So the Queens Viaduct will be replaced within the next 5-10 years is a good safe call but I wouldn't be surprised if the work was done sooner as they upgrade signals and begin upgrades for CBTC along the viaduct. Then again I'm a person who believes in killing two birds with one stone. If you want to get specific the tracks don't have to be really replaced until 2020 perhaps as late as 2025 if you really want to stretch it. So look forward to a Queens Viaduct rehab project somewhere in 2020!! LOL

Post a New Response

(909631)

view threaded

Newkirk Plaza David, that is great news, the weekend 7 GO is done

Posted by FYBklyn1959 on Tue Mar 9 12:50:42 2010, in response to Weekend 7 line G.O. work has been scrapped - - really., posted by Newkirk Plaza David on Tue Mar 9 11:55:34 2010.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Hehe

Post a New Response

(909632)

view threaded

Re: Newkirk Plaza David, that is great news, the weekend 7 GO is done

Posted by R42 4820 on Tue Mar 9 12:51:55 2010, in response to Newkirk Plaza David, that is great news, the weekend 7 GO is done, posted by FYBklyn1959 on Tue Mar 9 12:50:42 2010.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
At least it's the truth.

Post a New Response

(909633)

view threaded

Re: Newkirk Plaza David, that is great news, the weekend 7 GO is done

Posted by Newkirk Plaza David on Tue Mar 9 12:52:16 2010, in response to Newkirk Plaza David, that is great news, the weekend 7 GO is done, posted by FYBklyn1959 on Tue Mar 9 12:50:42 2010.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
But the new V reroute cannot be on the 7 viaduct, lol.

Post a New Response

(909638)

view threaded

V line via 7 line viaduct

Posted by Chris R16/R2730 on Tue Mar 9 13:09:32 2010, in response to Re: Newkirk Plaza David, that is great news, the weekend 7 GO is done, posted by Newkirk Plaza David on Tue Mar 9 12:52:16 2010.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
An idea which has for too long gone unproposed. Screw the physics.

Post a New Response

(909688)

view threaded

Re: Weekend 7 line G.O. work has been scrapped - - really.

Posted by 7th Avenue Express on Tue Mar 9 16:49:32 2010, in response to Weekend 7 line G.O. work has been scrapped - - really., posted by Newkirk Plaza David on Tue Mar 9 11:55:34 2010.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Looks like all the complaints from the rich yuppies in LIC were answered by the MTA, whereas complaints in other neighborhoods go unanswered, probably because they never complain to begin with.

Post a New Response

(909879)

view threaded

Re: Weekend 7 line G.O. work has been scrapped - - really.

Posted by Bee Flexible #823 on Wed Mar 10 01:33:19 2010, in response to Weekend 7 line G.O. work has been scrapped - - really., posted by Newkirk Plaza David on Tue Mar 9 11:55:34 2010.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Awesome news!

Post a New Response

(909920)

view threaded

Re: Weekend 7 line G.O. work has been scrapped - - really.

Posted by R36 #9346 on Wed Mar 10 07:55:24 2010, in response to Weekend 7 line G.O. work has been scrapped - - really., posted by Newkirk Plaza David on Tue Mar 9 11:55:34 2010.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Excellent news!

Post a New Response


[ Return to the Message Index ]