MTA- Capital plan overview

Posted by TransitChuckG on Mon Sep 16 18:55:06 2019

Overview

Post a New Response

(1524268)

view threaded

Re: MTA- Capital plan overview

Posted by Joe V on Mon Sep 16 18:59:07 2019, in response to MTA- Capital plan overview, posted by TransitChuckG on Mon Sep 16 18:55:06 2019.

Notice 20 diesel coaches and 10 locomotives for the LIRR. God know what they will be. Be very hard to order just 20 coaches unless riding on someone else's car order. Would have to be C-3 compatible.

Post a New Response

(1524269)

view threaded

Re: MTA- Capital plan overview

Posted by TransitChuckG on Mon Sep 16 19:07:27 2019, in response to Re: MTA- Capital plan overview, posted by Joe V on Mon Sep 16 18:59:07 2019.

I guess they have all figured out?

Post a New Response

(Sponsored)

iPhone 6 (4.7 Inch) Premium PU Leather Wallet Case - Red w/ Floral Interior - by Notch-It

(1524270)

view threaded

Re: MTA- Capital plan overview

Posted by Joe V on Mon Sep 16 19:13:01 2019, in response to Re: MTA- Capital plan overview, posted by TransitChuckG on Mon Sep 16 19:07:27 2019.

I wouldn't give them that much credit.
Could be Sumitomo MARC cars.
Could be NJT MLV cars that they'll call "C-5".
Could be Siemens cars that Amtrak is getting to replace Amfleet.

Post a New Response

(1524271)

view threaded

Re: MTA- Capital plan overview

Posted by italianstallion on Mon Sep 16 20:13:50 2019, in response to MTA- Capital plan overview, posted by TransitChuckG on Mon Sep 16 18:55:06 2019.

A lot of these are old projects.

Post a New Response

(1524273)

view threaded

Re: MTA- Capital plan overview

Posted by AlM on Mon Sep 16 20:28:34 2019, in response to Re: MTA- Capital plan overview, posted by italianstallion on Mon Sep 16 20:13:50 2019.

Yeah, it's pretty irritating to see LIRR 3rd track still there.



Post a New Response

(1524284)

view threaded

Re: MTA- Capital plan overview

Posted by lirr42 on Mon Sep 16 21:47:10 2019, in response to Re: MTA- Capital plan overview, posted by TransitChuckG on Mon Sep 16 19:07:27 2019.

It's none of those, it's going to be unpowered versions of the M-9A cars... It was going to be 30 option coaches, now it's down to just "nearly 20", which won't even bring them back to the number of seats they had in the old diesel fleet in the 1980's...

No electrification, other than the Central Branch, which is trivial.

Guess we're staying stuck in the last century for another five years...

Post a New Response

(1524293)

view threaded

Re: MTA- Capital plan overview

Posted by AEM-7AC #901 on Mon Sep 16 23:06:54 2019, in response to Re: MTA- Capital plan overview, posted by lirr42 on Mon Sep 16 21:47:10 2019.

Well, given how much money ESA has bled from the capital plan, one could argue that LIRR is tapped out for capital plan money...

Post a New Response

(1524361)

view threaded

Re: MTA- Capital plan overview

Posted by Joe V on Tue Sep 17 17:34:54 2019, in response to Re: MTA- Capital plan overview, posted by lirr42 on Mon Sep 16 21:47:10 2019.

It's going to continue being the Manhattan & Ronkonkoma RR Company.

They'll probably run them to Oyster Bay and Greenport.

Post a New Response

(1524373)

view threaded

Re: MTA- Capital plan overview

Posted by Steve B-8AVEXP on Tue Sep 17 18:19:45 2019, in response to MTA- Capital plan overview, posted by TransitChuckG on Mon Sep 16 18:55:06 2019.

Faster? That's debatable.

Post a New Response

(1524383)

view threaded

Re: MTA- Capital plan overview

Posted by Joe V on Tue Sep 17 18:58:39 2019, in response to Re: MTA- Capital plan overview, posted by lirr42 on Mon Sep 16 21:47:10 2019.

I don't see the use of electrifying the Central Branch, nor for the expanded Ronkonkoma Yard to be 10 or 11 tracks as opposed to 3 or 4 tracks. Anything but electrify to Port Jeff. These are stalling tactics.

Post a New Response

(1524399)

view threaded

Re: MTA- Capital plan overview

Posted by Andrew Saucci on Tue Sep 17 22:51:23 2019, in response to Re: MTA- Capital plan overview, posted by lirr42 on Mon Sep 16 21:47:10 2019.

Actually, the Central Branch electrification is important if they don't plan to purchase enough diesels to run proper service. They seem to want to shuttle-ize everything. With the third Main Line track and Central Branch electrification, they could run more Babylon expresses through Hicksville and relegate more diesels to shuttle service. I can easily see the Cannonball as the only through diesel run left at some point, with perhaps another minor electrification to Patchogue to push the diesels further into shuttle status.

Post a New Response

(1524412)

view threaded

Re: MTA- Capital plan overview

Posted by Q4 on Wed Sep 18 08:09:48 2019, in response to Re: MTA- Capital plan overview, posted by Joe V on Tue Sep 17 18:58:39 2019.

Work is already going on at the Ronkonkoma Yard to expand it so maybe it is already covered.

Post a New Response

(1524624)

view threaded

Re: MTA- Capital plan overview

Posted by Bill from Maspeth on Thu Sep 19 19:54:22 2019, in response to Re: MTA- Capital plan overview, posted by Andrew Saucci on Tue Sep 17 22:51:23 2019.

Eastbound Babylon Exp. only due to track configuration.

Post a New Response

(1524694)

view threaded

Re: MTA- Capital plan overview

Posted by Q4 on Fri Sep 20 15:42:37 2019, in response to MTA- Capital plan overview, posted by TransitChuckG on Mon Sep 16 18:55:06 2019.

So is East Side Access.

Post a New Response

(1524717)

view threaded

Re: MTA- Capital plan overview

Posted by TransitChuckG on Fri Sep 20 17:57:28 2019, in response to MTA- Capital plan overview, posted by TransitChuckG on Mon Sep 16 18:55:06 2019.