Is 2nd Ave powered up?

Posted by zac on Mon Aug 22 18:09:35 2016

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Is the power turned on, even if for testing, on the tracks on 2nd Avenue? Would it be possible to run a test train up there under traction power? Has one already run?

And if not, when? I'm sure someone has an answer, or maybe not, as we'd already know.

The politicians are ready I'm sure to take the inaugural ride, to take credit for something they had no input on. Let's hope it isn't a year and a half between the inaugural and the public opening as it was with Hudson Yards. Given the thread below on the pick, it appears they are optimistic it will open on time.


Post a New Response

(1406016)

view threaded

Re: Is 2nd Ave powered up?

Posted by handbrake on Mon Aug 22 18:26:54 2016, in response to Is 2nd Ave powered up?, posted by zac on Mon Aug 22 18:09:35 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
The contractor is scheduled to turn over the SAS structure to NYCT on 1 October for NYC transit to perform testing, and acceptance of all support equipment. Is power on today? not at this time, since the contractor still owns the incomplete RoW

Post a New Response

(1406021)

view threaded

Re: Is 2nd Ave powered up?

Posted by r33/r36 mainline on Mon Aug 22 19:01:32 2016, in response to Is 2nd Ave powered up?, posted by zac on Mon Aug 22 18:09:35 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
The signals are powered on. Photo proof in the link...

web.mta.info/capital/sas_pdf/CB8%20SAS%20Task%20Force%20July%2021%202016.pdf

Post a New Response

(Sponsored)

iPhone 6 (4.7 Inch) Premium PU Leather Wallet Case - Red w/ Floral Interior - by Notch-It

(1406028)

view threaded

Re: Is 2nd Ave powered up?

Posted by Elkeeper on Mon Aug 22 20:35:27 2016, in response to Re: Is 2nd Ave powered up?, posted by r33/r36 mainline on Mon Aug 22 19:01:32 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Let's hope my neighbor is wrong and there are no problems with the signals!

Post a New Response

(1406031)

view threaded

Re: Is 2nd Ave powered up?

Posted by FormerVanWyckBlvdUser on Mon Aug 22 21:48:42 2016, in response to Is 2nd Ave powered up?, posted by zac on Mon Aug 22 18:09:35 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Something not mentioned.

Timer signals from 63rd to 96th St now installed, guaranteed maximum speed will be 15 MPH.

HYUK!

Post a New Response

(1406034)

view threaded

Re: Is 2nd Ave powered up?

Posted by Steve B-8AVEXP on Mon Aug 22 22:00:16 2016, in response to Re: Is 2nd Ave powered up?, posted by FormerVanWyckBlvdUser on Mon Aug 22 21:48:42 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
You'll make better time by walking.:)

Post a New Response

(1406063)

view threaded

Re: Is 2nd Ave powered up?

Posted by MainR3664 on Tue Aug 23 08:00:03 2016, in response to Re: Is 2nd Ave powered up?, posted by r33/r36 mainline on Mon Aug 22 19:01:32 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
I just went through the slide deck. That's incredible. Even if they don't open in December, I no longer have any doubt they'll get this job done- and soon.

When they started in 2007, I had zero confidence they'd get beyond digging. The SAS has just been one of those things NYers talked about forever.

Absolutely amazing. Hopefully, with the experience gained from this project, they can move on to Phase 2- for which, as we all know, some tunnels are already in place. Hoping...hoping....

Post a New Response

(1406069)

view threaded

Re: Is 2nd Ave powered up?

Posted by terRAPIN station on Tue Aug 23 08:53:09 2016, in response to Re: Is 2nd Ave powered up?, posted by MainR3664 on Tue Aug 23 08:00:03 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d


When they started in 2007, I had zero confidence they'd get beyond digging. The SAS has just been one of those things NYers talked about forever.
Why? What modern-era transportation projects have been dug but not completed?

Post a New Response

(1406071)

view threaded

Re: Is 2nd Ave powered up?

Posted by AlM on Tue Aug 23 08:58:14 2016, in response to Re: Is 2nd Ave powered up?, posted by terRAPIN station on Tue Aug 23 08:53:09 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Agreed.

However, ESA is taking painfully long and is way behind schedule. (I have no doubt it will be completed.) And some of us think of the 1970s as being in the modern era. :)



Post a New Response

(1406084)

view threaded

Re: Is 2nd Ave powered up?

Posted by Alan Follett on Tue Aug 23 11:20:42 2016, in response to Re: Is 2nd Ave powered up?, posted by terRAPIN station on Tue Aug 23 08:53:09 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Well, not "dug," since it was elevated; but in the 1990s there was CTA's rebuilt Green Line east of Cottage Grove, about 3/4 mile. The structure, partly new steel at a lower level than the former Jackson Park Branch, was torn down, due to community objections, without ever being put into operation. (NIMBYism, it seems, is not confined to suburbia.)

Alan Follett
Hercules, CA

Post a New Response

(1406088)

view threaded

Re: Is 2nd Ave powered up?

Posted by AEM-7AC #901 on Tue Aug 23 12:25:35 2016, in response to Re: Is 2nd Ave powered up?, posted by AlM on Tue Aug 23 08:58:14 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
However, ESA is taking painfully long and is way behind schedule

I suspect it's because nobody realized the stupidity of building an eight track train yard with platforms in a giant cave in solid bedrock. When compared with London's Crossrail or Paris RER's operation practices, we spent absurd amounts of money because we can't think outside of the box and the LIRR's too wimpy to achieve rapid transit turn-around times.

Post a New Response

(1406092)

view threaded

Re: Is 2nd Ave powered up?

Posted by Steamdriven on Tue Aug 23 12:57:36 2016, in response to Re: Is 2nd Ave powered up?, posted by FormerVanWyckBlvdUser on Mon Aug 22 21:48:42 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Srsly? I don't even wanna know their excuse for that one.
The subway ran fine in the '50s without those things.

Post a New Response

(1406093)

view threaded

Re: Is 2nd Ave powered up?

Posted by Steamdriven on Tue Aug 23 12:59:11 2016, in response to Re: Is 2nd Ave powered up?, posted by AEM-7AC #901 on Tue Aug 23 12:25:35 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
When it's someone else's money, cost is no obstacle.

Post a New Response

(1406099)

view threaded

Re: Is 2nd Ave powered up?

Posted by AlM on Tue Aug 23 14:01:10 2016, in response to Re: Is 2nd Ave powered up?, posted by AEM-7AC #901 on Tue Aug 23 12:25:35 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
I think what's holding up the schedules is issues in LIC, not under GCT.