Home · Maps · About

Home > SubChat

[ Post a New Response | Return to the Index ]

[1 2]

 

Page 1 of 2

Next Page >  

(1403299)

view threaded

Design studio proposes E train extension Via G

Posted by Meridian on Tue Jul 26 10:13:28 2016

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
http://qns.com/story/2016/07/25/design-studio-proposes-e-train-extension-to-alleviate-negative-effects-of-the-18-month-l-train-shutdown/

Post a New Response

(1403317)

view threaded

Re: Design studio proposes E train extension Via G

Posted by terRAPIN station on Tue Jul 26 13:51:04 2016, in response to Design studio proposes E train extension Via G, posted by Meridian on Tue Jul 26 10:13:28 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
The ReThink Studio pro­posal

Post a New Response

(1403319)

view threaded

Re: Design studio proposes E train extension Via G

Posted by terRAPIN station on Tue Jul 26 13:51:39 2016, in response to Design studio proposes E train extension Via G, posted by Meridian on Tue Jul 26 10:13:28 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
As commenters have already noted, supposedly there is no capacity in the Cranberry Tube for E trains.

Post a New Response

(Sponsored)

iPhone 6 (4.7 Inch) Premium PU Leather Wallet Case - Red w/ Floral Interior - by Notch-It

(1403322)

view threaded

Re: Design studio proposes E train extension Via G

Posted by Broadway Lion on Tue Jul 26 14:02:06 2016, in response to Re: Design studio proposes E train extension Via G, posted by terRAPIN station on Tue Jul 26 13:51:39 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Eh... The (C) can terminate at WTC...

The (E) can then go Crosstown as proposed with the (A) taking on the local stops along Fulton.

Perhaps alternate (E) trains can do Cross town and Euclid, but with the (A) still making all stops. Maybe we can even break out the old (EE) Signs for the Crosstown. : )

ROAR

Post a New Response

(1403323)

view threaded

Re: Design studio proposes E train extension Via G

Posted by Dan on Tue Jul 26 14:03:49 2016, in response to Design studio proposes E train extension Via G, posted by Meridian on Tue Jul 26 10:13:28 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Aren't the G and A/C tracks at slightly different levels?

Post a New Response

(1403324)

view threaded

Re: Design studio proposes E train extension Via G

Posted by Elkeeper on Tue Jul 26 14:03:50 2016, in response to Re: Design studio proposes E train extension Via G, posted by terRAPIN station on Tue Jul 26 13:51:04 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Well, what do they propose to replace "E" service to Jamaica and the LIRR? Run 8 car expresses on the "M" line? Also, there are no track connections between the "A" and "G" tracks at either end of Hoyt-Schermerhorn.

Post a New Response

(1403337)

view threaded

Re: Design studio proposes E train extension Via G

Posted by Allan on Tue Jul 26 14:37:48 2016, in response to Re: Design studio proposes E train extension Via G, posted by Dan on Tue Jul 26 14:03:49 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
At Hoyt-Schermerhorn? No they are on the same level but are "opposite" directions.

On the platform for the s/b "A/C" you have a n/b "G" (to Court Sq) across the platform.

You have the opposite on the n/b "A/C" platform.

Post a New Response

(1403339)

view threaded

Re: Design studio proposes E train extension Via G

Posted by Elkeeper on Tue Jul 26 14:41:55 2016, in response to Re: Design studio proposes E train extension Via G, posted by Broadway Lion on Tue Jul 26 14:02:06 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Lion, it sounds like Brother Wallyhorse is spending the summer at your monastery!

Post a New Response

(1403342)

view threaded

Re: Design studio proposes E train extension Via G

Posted by Express Rider on Tue Jul 26 15:00:21 2016, in response to Re: Design studio proposes E train extension Via G, posted by Broadway Lion on Tue Jul 26 14:02:06 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
re: Maybe we can even break out the old (EE) Signs

- they'll need to run the arnines then

Post a New Response

(1403347)

view threaded

Re: Design studio proposes E train extension Via G

Posted by TerrApin Station on Tue Jul 26 15:22:03 2016, in response to Re: Design studio proposes E train extension Via G, posted by Elkeeper on Tue Jul 26 14:03:50 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
E service to Jamaica would not change.

The proposal already addressed the H-S track connection issue.

Post a New Response

(1403348)

view threaded

Re: Design studio proposes E train extension Via G

Posted by TerrApin Station on Tue Jul 26 15:26:24 2016, in response to Re: Design studio proposes E train extension Via G, posted by Broadway Lion on Tue Jul 26 14:02:06 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Without looking into your ideas in depth, my first reaction is that A service could become deficient and/or the alternating E trains world not adequately service one or both of the southern branches.

Post a New Response

(1403349)

view threaded

Re: Design studio proposes E train extension Via G

Posted by TerrApin Station on Tue Jul 26 15:28:53 2016, in response to Re: Design studio proposes E train extension Via G, posted by Allan on Tue Jul 26 14:37:48 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
But that doesn't affect the proposed plan.

Post a New Response

(1403360)

view threaded

Re: Design studio proposes E train extension Via G

Posted by randyo on Tue Jul 26 16:37:45 2016, in response to Re: Design studio proposes E train extension Via G, posted by Express Rider on Tue Jul 26 15:00:21 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
R-32s also had EE signs even though the cars were never used there.

Post a New Response

(1403366)

view threaded

Re: Design studio proposes E train extension Via G

Posted by Dyre Dan on Tue Jul 26 17:03:45 2016, in response to Re: Design studio proposes E train extension Via G, posted by terRAPIN station on Tue Jul 26 13:51:04 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
The E would then have a transfer to another part of its own line at Court Square/23rd St. A rather unique situation. And what would become of the WTC terminal platform? Simply close it?


Post a New Response

(1403373)

view threaded

Re: Design studio proposes E train extension Via G

Posted by Wallyhorse on Tue Jul 26 18:38:46 2016, in response to Re: Design studio proposes E train extension Via G, posted by Elkeeper on Tue Jul 26 14:03:50 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Actually, if done right, the (E) could actually operate as a loop line with Jamaica Center the sole terminal if done this way (as coming back, the (E) could actually continue via QB local). Perhaps if so such a service could be given a different letter to distinguish itself.

That said, an easier alternative to me would be to extend the (G) (M) and (R) all to 179th and have the (F) run express its full route. That would essentially serve the same purpose as this proposal.

Post a New Response

(1403374)

view threaded

Re: Design studio proposes E train extension Via G

Posted by Wallyhorse on Tue Jul 26 18:45:24 2016, in response to Re: Design studio proposes E train extension Via G, posted by Dyre Dan on Tue Jul 26 17:03:45 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
This is where it too bad you can't simply convert the Transit Museum back into an active train station:

Then, what you could do is split the (C) by having half the line run between Court (current Transit Museum) and Euclid and the other half run between 168 and Chambers with the (E) replacing the (C) at Hoyt-Schermerhorn in this scenario. That would be IF you can add the track connection proposed in it.

Post a New Response

(1403375)

view threaded

Re: Design studio proposes E train extension Via G

Posted by Wallyhorse on Tue Jul 26 18:46:05 2016, in response to Re: Design studio proposes E train extension Via G, posted by Elkeeper on Tue Jul 26 14:41:55 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
LOL!!!

Post a New Response

(1403379)

view threaded

Re: Design studio proposes E train extension Via G

Posted by AlM on Tue Jul 26 19:12:34 2016, in response to Re: Design studio proposes E train extension Via G, posted by terRAPIN station on Tue Jul 26 13:51:39 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
If Peter Dougherty's map from 2000 is still correct, that's the least of their problems. You can't get from the G to the A/C/E at Hoyt-Schermerhorn.




Post a New Response

(1403382)

view threaded

Re: Design studio proposes E train extension Via G

Posted by Elkeeper on Tue Jul 26 20:05:44 2016, in response to Re: Design studio proposes E train extension Via G, posted by AlM on Tue Jul 26 19:12:34 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Not without alignments and switching!

Post a New Response

(1403389)

view threaded

Re: Design studio proposes E train extension Via G

Posted by Terrapin Station on Tue Jul 26 20:39:11 2016, in response to Re: Design studio proposes E train extension Via G, posted by AlM on Tue Jul 26 19:12:34 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d


that's the least of their problems.
No it's not.

You can't get from the G to the A/C/E at Hoyt-Schermerhorn.
That issue was already addressed by the plan.

So it's like I said...

Post a New Response

(1403395)

view threaded

Re: Design studio proposes E train extension Via G

Posted by Edwards! on Tue Jul 26 21:34:45 2016, in response to Re: Design studio proposes E train extension Via G, posted by Terrapin Station on Tue Jul 26 20:39:11 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
My my...
Making up for time lost,arent we?

You go boy...make those pennies.

Post a New Response

(1403405)

view threaded

Edwards is an anti-Semite and Racist -- Re: Design studio proposes E train extension Via G

Posted by Terrapin Station on Tue Jul 26 23:35:29 2016, in response to Re: Design studio proposes E train extension Via G, posted by Edwards! on Tue Jul 26 21:34:45 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
See previous post here: Re: Design studio proposes E train extension Via G (1403395)

I know, I know, he can't help himself. But that doesn't mean he needs to drag the rest of the forum down with him.

Post a New Response

(1403410)

view threaded

Re: Design studio proposes E train extension Via G

Posted by WillD on Wed Jul 27 00:08:43 2016, in response to Re: Design studio proposes E train extension Via G, posted by TerrApin Station on Tue Jul 26 15:22:03 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
The proposal might have addressed the Hoyt-Schermerhorn switch issue, but that does not mean their solution is adequate. Why would you want to have a sharp curve in the last few dozen feet of an otherwise nearly tangent platform? Also is there sufficient clearance above the trains for the girders that'd be required to carry the load of the columns that'd have to be deleted in the red hatched areas? And finally, positioning the switch at the very end of the platform would seem to require the train to nearly knock down the signal while platformed. That could have a catastrophic impact on G train capacity right when it is most needed.

Post a New Response

(1403416)

view threaded

Re: Design studio proposes E train extension Via G

Posted by Terrapin Station on Wed Jul 27 00:13:30 2016, in response to Re: Design studio proposes E train extension Via G, posted by WillD on Wed Jul 27 00:08:43 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d


The proposal might have addressed the Hoyt-Schermerhorn switch issue, but that does not mean their solution is adequate.
I never said it was adequate.

Post a New Response

(1403419)

view threaded

Re: Design studio proposes E train extension Via G

Posted by WillD on Wed Jul 27 00:30:42 2016, in response to Re: Design studio proposes E train extension Via G, posted by Terrapin Station on Wed Jul 27 00:13:30 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
No, you said it was addressed, without further comment on your part. In that case I can only assume you felt their solution was adequate.

Post a New Response

(1403422)

view threaded

Re: Design studio proposes E train extension Via G

Posted by R30A on Wed Jul 27 00:50:10 2016, in response to Re: Design studio proposes E train extension Via G, posted by Allan on Tue Jul 26 14:37:48 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
They may well be at different levels by the location a switch would end at.

Post a New Response

(1403424)

view threaded

Re: Design studio proposes E train extension Via G

Posted by Express Rider on Wed Jul 27 01:05:02 2016, in response to Re: Design studio proposes E train extension Via G, posted by randyo on Tue Jul 26 16:37:45 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
thanks for the info.

Post a New Response

(1403426)

view threaded

Re: Design studio proposes E train extension Via G

Posted by The Silence on Wed Jul 27 01:12:20 2016, in response to Re: Design studio proposes E train extension Via G, posted by Wallyhorse on Tue Jul 26 18:45:24 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
that's absolutely pointless...

The transfer havoc this would cause would be absolute chaos. Hoyt would be a zoo.

Post a New Response

(1403427)

view threaded

Re: Design studio proposes E train extension Via G

Posted by The Silence on Wed Jul 27 01:15:48 2016, in response to Re: Design studio proposes E train extension Via G, posted by Dan on Tue Jul 26 14:03:49 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
at the ends of the stations, yes, the G tracks start to drop as they leave.

Post a New Response

(1403437)

view threaded

Re: Design studio proposes E train extension Via G

Posted by TerrApin Station on Wed Jul 27 07:14:06 2016, in response to Re: Design studio proposes E train extension Via G, posted by WillD on Wed Jul 27 00:30:42 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
No, I was responding to someone who obviously didn't read the plan and therefore obviously felt that it wasn't addressed at all.

Post a New Response

(1403448)

view threaded

Re: Design studio proposes E train extension Via G

Posted by Broadway Lion on Wed Jul 27 10:32:28 2016, in response to Re: Design studio proposes E train extension Via G, posted by Wallyhorse on Tue Jul 26 18:38:46 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Your last, although a blast, is not in the cards. 179 has not the problem, Canarsie does have the problem.

ROAR

Post a New Response

(1403449)

view threaded

Re: Design studio proposes E train extension Via G

Posted by Broadway Lion on Wed Jul 27 10:33:28 2016, in response to Re: Design studio proposes E train extension Via G, posted by The Silence on Wed Jul 27 01:12:20 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
HOYT is already a zoo.

And they got animals down there to proff it.

Post a New Response

(1403450)

view threaded

Re: Design studio proposes E train extension Via G

Posted by Broadway Lion on Wed Jul 27 10:34:52 2016, in response to Re: Design studio proposes E train extension Via G, posted by randyo on Tue Jul 26 16:37:45 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
LION is not so sure about that. Certainly the 27s and 30s did use them, yes?

Post a New Response

(1403484)

view threaded

Re: Design studio proposes E train extension Via G

Posted by #5 - Dyre Ave on Wed Jul 27 15:13:07 2016, in response to Re: Design studio proposes E train extension Via G, posted by The Silence on Wed Jul 27 01:15:48 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
As soon as they leave? Then there isn't even sufficient space to build the connecting switches between the G and the A/C. Not to mention that Hoyt and Canal would be even bigger bottlenecks than they already are.

Post a New Response

(1403489)

view threaded

Re: Design studio proposes E train extension Via G

Posted by randyo on Wed Jul 27 15:20:58 2016, in response to Re: Design studio proposes E train extension Via G, posted by Broadway Lion on Wed Jul 27 10:34:52 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
The original roll signs on the R-27s through 38s didn’t have then but when the new post Chrystie roll signs were installed on those cars, the reading was included.

Post a New Response

(1403501)

view threaded

Re: Design studio proposes E train extension Via G

Posted by Elkeeper on Wed Jul 27 18:48:58 2016, in response to Re: Design studio proposes E train extension Via G, posted by Wallyhorse on Tue Jul 26 18:46:05 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
you can do it, Wally! I survived Catholic grammar school/high school/university (St John's)!

Post a New Response

(1403502)

view threaded

Re: Design studio proposes E train extension Via G

Posted by Elkeeper on Wed Jul 27 18:54:48 2016, in response to Re: Design studio proposes E train extension Via G, posted by Broadway Lion on Tue Jul 26 14:02:06 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
First things first! Can crossovers between the "A" and the "G" tracks be installed?

Post a New Response

(1403507)

view threaded

Re: Design studio proposes E train extension Via G

Posted by AlM on Wed Jul 27 19:22:04 2016, in response to Re: Design studio proposes E train extension Via G, posted by Elkeeper on Wed Jul 27 18:54:48 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
The whole thing is so riddled with problems that that's the last question to ask.

Not that many L train riders live close to the G. People in the Bedford Ave neighborhood and around Graham to Morgan might as well take a shuttle bus to the M. People beyond Myrtle might as well take their inbound L and switch to the 3, A, J/Z, or M. People in Greenpoint are just going to take the G to the E/M anyway.

The key is having extra G trains, extra Ms in both directions, a few extra J/Zs, and maybe an extra A and 3.


Post a New Response

(1403518)

view threaded

Re: Design studio proposes E train extension Via G

Posted by Elkeeper on Wed Jul 27 20:14:24 2016, in response to Re: Design studio proposes E train extension Via G, posted by AlM on Wed Jul 27 19:22:04 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
perhaps, you are right. Besides, by the time any crossovers are installed, east or west of Hoyt, the 14th St tunnel will be finished!

Post a New Response

(1403548)

view threaded

Re: Design studio proposes E train extension Via G

Posted by jabrams on Wed Jul 27 23:14:16 2016, in response to Re: Design studio proposes E train extension Via G, posted by Elkeeper on Tue Jul 26 20:05:44 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
No, You take the G at Lorimer and transfer (cross platform at H-S to the A or C and the if you want the F at Jay. Or you take the G to Court Sq. and transfer to the E/F to Manhattan for another method.

Post a New Response

(1403635)

view threaded

Re: Design studio proposes E train extension Via G

Posted by Dyre Dan on Thu Jul 28 16:42:13 2016, in response to Re: Design studio proposes E train extension Via G, posted by The Silence on Wed Jul 27 01:12:20 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
If the A and E could open their doors on both sides at Hoyt, it should be workable. And I don't see why they couldn't. On cars with full-width cabs, it shouldn't be a problem. (Except that they aren't about to convert Court St. back to being an active station.)

I'm just wondering how the signage at Court Square would look. E and G this way, E and M that way.


Post a New Response

(1403637)

view threaded

Re: Design studio proposes E train extension Via G

Posted by Dyre Dan on Thu Jul 28 16:50:21 2016, in response to Re: Design studio proposes E train extension Via G, posted by Dyre Dan on Thu Jul 28 16:42:13 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
If the added switches were west of Hoyt, then of course it would be only the A opening on both sides.

Post a New Response

(1403646)

view threaded

Re: Design studio proposes E train extension Via G

Posted by randyo on Thu Jul 28 17:53:24 2016, in response to Re: Design studio proposes E train extension Via G, posted by Dyre Dan on Thu Jul 28 16:50:21 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
There is even less room west of Hoyt than there is east of it.

Post a New Response

(1403717)

view threaded

Re: Edwards is an anti-Semite and Racist -- Re: Design studio proposes E train extension Via G

Posted by Dyre Dan on Fri Jul 29 09:19:14 2016, in response to Edwards is an anti-Semite and Racist -- Re: Design studio proposes E train extension Via G, posted by Terrapin Station on Tue Jul 26 23:35:29 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Why link to a message that is already linked to automatically via the "in response to" field?

Post a New Response

(1403753)

view threaded

Brian is a certified Asshole. and 128545;that everyone knows...RE: E train extension Via G

Posted by Edwards! on Fri Jul 29 13:25:13 2016, in response to Edwards is an anti-Semite and Racist -- Re: Design studio proposes E train extension Via G, posted by Terrapin Station on Tue Jul 26 23:35:29 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
The Problem here,is the fact that YOU can help yourself,but choose not to.

ASSHOLE.

Post a New Response

(1403754)

view threaded

Re: Edwards is an anti-Semite and Racist -- Re: Design studio proposes E train extension Via G

Posted by Spider-Pig on Fri Jul 29 13:27:07 2016, in response to Re: Edwards is an anti-Semite and Racist -- Re: Design studio proposes E train extension Via G, posted by Dyre Dan on Fri Jul 29 09:19:14 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Emphasis?

Post a New Response

(1403757)

view threaded

Re: Brian is a certified Asshole. and 128545;that everyone knows...RE: E train extension Via G

Posted by salaamallah@hotmail.com on Fri Jul 29 13:37:39 2016, in response to Brian is a certified Asshole. and 128545;that everyone knows...RE: E train extension Via G, posted by Edwards! on Fri Jul 29 13:25:13 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
iawtp

Post a New Response

(1403762)

view threaded

Re: Brian is a certified Asshole. and 128545;that everyone knows...RE: E train extension Via G

Posted by JayZeeBMT on Fri Jul 29 14:52:39 2016, in response to Brian is a certified Asshole. and 128545;that everyone knows...RE: E train extension Via G, posted by Edwards! on Fri Jul 29 13:25:13 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Be careful. Nostalgia dared to challenge His Turtleship on BusChat, and now both he, and the relevant thread, are gone. Only The Turtle seems to have the ability to delete threads (and posters) he doesn't like, from this site.

Gee, I wonder why that is?

Post a New Response

(1403799)

view threaded

Re: Brian is a certified Asshole. and 128545;that everyone knows...RE: E train extension Via G

Posted by TerrApin Station on Fri Jul 29 20:03:38 2016, in response to Re: Brian is a certified Asshole. and 128545;that everyone knows...RE: E train extension Via G, posted by JayZeeBMT on Fri Jul 29 14:52:39 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
You wonder? Because I own the site and am the moderator, right?

Post a New Response

(1403800)

view threaded

Re: Edwards is an anti-Semite and Racist -- Re: Design studio proposes E train extension Via G

Posted by TerrApin Station on Fri Jul 29 20:04:35 2016, in response to Re: Edwards is an anti-Semite and Racist -- Re: Design studio proposes E train extension Via G, posted by Spider-Pig on Fri Jul 29 13:27:07 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Sure, why not.

Post a New Response

[1 2]

 

Page 1 of 2

Next Page >  


[ Return to the Message Index ]