| Re: 4th Ave. as a G terminal after the viaduct construction? (805080) | |||
|
|
|||
| Home > SubChat | |||
|
[ Read Responses | Post a New Response | Return to the Index ] |
|
||
Re: 4th Ave. as a G terminal after the viaduct construction? |
|
|
Posted by metropod on Sun Jul 5 13:39:34 2009, in response to Re: 4th Ave. as a G terminal after the viaduct construction?, posted by randyo on Sun Jul 5 13:01:17 2009. that would require having the V run on weekends and staffing the tower at W4th almost all the time. |