| Re: SAS Phase 4: Water Street (564089) | |||
|
|
|||
| Home > SubChat | |||
|
[ Read Responses | Post a New Response | Return to the Index ] |
|
||
Re: SAS Phase 4: Water Street |
|
|
Posted by Russ on Sun Feb 3 16:30:03 2008, in response to Re: SAS Phase 4: Water Street/Nassau Street, posted by Grand concourse on Thu Jan 31 23:38:26 2008. That's not what I wrote. I wrote that Phase 4 is in the $4 billion range (actually estimated at $4.8 billion in the FEIS,) and that a tunnel may be in that range. That could be $9 billion+. Advocating the construction of two Phase 4 alignments, even though one is renamed, would also be in the $9 billion range. |