| Re: SAS Phase 4: Water Street/Nassau Street (562235) | |||
|
|
|||
| Home > SubChat | |||
|
[ Read Responses | Post a New Response | Return to the Index ] |
|
||
Re: SAS Phase 4: Water Street/Nassau Street |
|
|
Posted by Russ on Thu Jan 31 20:27:17 2008, in response to Re: SAS Phase 4: Water Street/Nassau Street, posted by R160 8818 on Thu Jan 31 20:18:54 2008. Building both segments would cost at least an extra $4 Billion. If that extra money will be available, then Water St plus a tunnel to Brooklyn can be built. This, unlike the Nassau St alignment, allows two SAS routes plus the J (assuming that the M is merged with the V) plus the R to all reach Brooklyn. If Nassau is built, Only two routes can travel south of Chambers. Entering the Montague St. tunnel, only two lines can proceed.I reject the notion that the SAS will get two Phase 4s built. I would benefit from this more than most because I live between the Seaport and Chambers, but I would never advocate for this to come to pass because even if it was politically possible, it would deprive other important projects of billions of dollars. |