Re: SAS Phases 3/4: Water Street/Nassau Street |
|
|
Posted by Wallyhorse on Mon Feb 4 01:26:58 2008, in response to Re: SAS Phases 3/4: Water Street/Nassau Street, posted by Russ on Sun Feb 3 16:36:24 2008. Russ:The thinking is, combing the Nassau connection with Phase 3 probably saves money since both would be done at once, plus making Nassau part of Phase 3 allows downtown access years before Phase 4 can be completed, and avoids having the T terminate at Houston while Phase 4 is being built. Also, needs can change between now and the time Phases 3 and 4 are actually built. |