Re: SAS via Montague tunnel/Nassau Street |
|
|
Posted by Wado MP73 on Mon Jan 28 12:43:14 2008, in response to Re: SAS via Montague tunnel/Nassau Street, posted by Wallyhorse on Mon Jan 28 00:52:24 2008. Again, the FEIS states otherwise:In conclusion, the Nassau Street Option would not meet the goals and objectives of the project as well as the Water Street Option. It would not reduce crowding levels on the Lexington Avenue Line to the same degree as the Water Street Option. With the Nassau Street Option, crowding levels on the Lexington Avenue 4, 5 express routes would continue to exceed NYCT’s loading guidelines at Grand Central Station. With a Nassau connection, you would also lose the transfer at Grand St. to/from the Sixth Ave. line. |