| Re: SAS Phase 4: Water Street (558833) | |||
|
|
|||
| Home > SubChat | |||
|
[ Read Responses | Post a New Response | Return to the Index ] |
|
||
Re: SAS Phase 4: Water Street |
|
|
Posted by Wallyhorse on Fri Jan 25 04:45:14 2008, in response to Re: SAS Phase 4: Water Street, posted by SMAZ on Fri Jan 25 03:44:04 2008. I agree with that, except again, to do it from there and speed up the start of the Nassau Street Line phase of the SAS would require phase 3 to be extended to Chatam Square and beyond there enough to include such a connect to the Nassau Street line (though that would be good because it also means the Grand Street connection to the B/D would be open a lot sooner as well). That was why I was saying do it from Houston if possible.As for the potential problems of lengthening the Nassau Street Line stations, that is a potential issue regardless of any SAS connection since it may be necessary to extend those stations and the rest of those on the J/M/Z anyway because of increased ridership on the Broadway Brooklyn lines. |