| Re: SAS/four tracks (557411) | |||
|
|
|||
| Home > SubChat | |||
|
[ Read Responses | Post a New Response | Return to the Index ] |
|
||
Re: SAS/four tracks |
|
|
Posted by Wallyhorse on Mon Jan 21 20:24:12 2008, in response to Re: SAS/four tracks, posted by GP38/R42 Chris on Mon Jan 21 16:54:05 2008. Absolutely:The first thing that needs to be done is get this two-track stub portion of the SAS built, and if possible tack on the part of phase 2 that can have it open with the line going to 116th street instead of 96th (which would not be that expensive an addition given the portion of track north of 96th already built and the fact it cut the cost of doing the remainder of phase 2 later on). |