Re: Tuscarora Almanac for May 10 - Culver Shuttle closure (1641238) | |||
![]() |
|||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
![]() |
Re: Tuscarora Almanac for May 10 - Culver Shuttle closure |
|
Posted by Wallyhorse on Sun May 11 18:37:56 2025, in response to Re: Tuscarora Almanac for May 10 - Culver Shuttle closure, posted by Dan on Sat May 10 10:57:54 2025. I remember they were finally tearing it down in 1983 when I would pass by there on the B35.I still say that is one I would rebuild as close to the Right of Way as possible on mostly two levels of single track that would allow for a Broadway/4th Avenue service to run via Culver (to Manhattan on the upper level, from Manhattan on the lower level with as possible both ways on the same level at stops that closely resemble the old line. The Manhattan direction for any Culver line trains would stop on a new upper level of Ditmas Avenue northbound (before crossing over the other tracks on essentially a bridge) while trains to Coney Island would stop in the same area the old shuttle trains terminated at before merging south of Ditmas going to. This could be a way to have the (W) operate at all times from Coney Island to Astoria. |
![]() |
![]() |
![]() |