Re: When BOWERY Was Considered a Terminal (1548157) | |||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: When BOWERY Was Considered a Terminal |
|
Posted by randyo on Thu May 21 15:42:11 2020, in response to Re: When BOWERY Was Considered a Terminal, posted by SLRT on Thu May 21 15:04:06 2020. One of the early ERA NY Div bulletins showed a track map with all 4 tks going through during the construction of the Centre St Line whether it was actually done or not. When the Essex St master tower was installed in the early 1960s, the model board showed all 4 tks going through prior to the decommissioning of tks J1 and J3 so it was eventually intended for all 4 tks to go through. |