Re: 2nd Ave Subway Setback |
|
Posted by Jackson Park B Train on Mon Jan 27 01:17:16 2020, in response to Re: 2nd Ave Subway Setback, posted by Spider-Pig on Sun Jan 26 23:10:28 2020. which was a likely outcome back then IMHO. I am glad we got something although the stupid design driven costs and the featherbedding /corruption cheated us of a better product. ANY new subway work should be shallow cut and coveras done on the original IRT. Way cheaper to build, way more rider useful, lower operational costs. US transit projects are the most expensive per mile on the planet; we must fix this or we really won'tsee any new segments. |